PORTABLE GANTRY CRANE

Portable gantry crane for your workspace

Start with what you need to lift and where you need to work. Share the load, available space and delivery destination. We can discuss a portable gantry configuration for your application; model availability and specifications need confirmation.

Capacity, span and lifting height are confirmed for the quoted configuration.

HEIGHT-ADJUSTABLE GANTRY

Explore the adjustable frame

Height-adjustable gantry frame with yellow beam, black uprights and swivel casters

Height-adjustable portable gantry crane

Adjustable-height uprights, demountable components and braking swivel casters.

View product & photos →
Trackless gantry on a white background with right-hand beam branding and continuous red cables

TRACKLESS GANTRY

Trackless mobile gantry crane

Explore motorized wheel arrangements and configuration examples for your workspace.

View product & photos →
Silver mobile gantry frame with pure-black Krandura branding

STAINLESS STEEL GANTRY

Stainless steel mobile gantry crane

Explore the silver-finish frame, component details and illustrative production settings.

View product & photos →
Silver aluminium gantry with yellow joint plates, side hand winches and manual chain hoist

ALUMINIUM GANTRY

Aluminium mobile gantry crane

Explore modular frame configurations, manual adjustment arrangements and component details.

View product & photos →

Describe the job before choosing a model

What are you lifting? Where will it be picked up and placed? Tell us whether you need one lifting position or several work areas. A short description is enough to begin.

Check the complete working envelope

Share the space between obstacles, available building height and where the load needs to reach. Ask for the exact overall dimensions, clear span and usable hook height together on the supplier drawing.

What affects the quotation?

The quoted configuration, hoist and trolley, adjustment and travel arrangement, power supply, packing and destination all need to be clear. Ask which items and shipping terms are included before comparing prices.

The eleven values to measure around the frame, and the eight items that explain a difference between two offers, are collected on the crane planning worksheet.

LET'S DISCUSS YOUR JOB

Can a portable gantry fit your workshop?

Tell us about your workspace. We will follow up on the details needed for a quotation.

WhatsApp our team ↗

Or email our team directly. If the form does not load, use email or WhatsApp.

Send your enquiry directly to our team. Our form service processes your message and we use your details to respond to this enquiry. If the security check does not appear after a few seconds, use the email or WhatsApp links below — your answers are copied into the message. Privacy & enquiries.

Security check not loading, or prefer a direct message? Send the same details by email or WhatsApp — your answers are copied into the message.

These links open your email app or WhatsApp. Review the message and send it there.

BEFORE YOU ENQUIRE

Questions about your next step

Can I ask about a 2 ton portable gantry?

Yes. Describe 2 tonnes as your required load, together with your workspace and lifting task. This is an enquiry requirement; the model, rating and complete configuration must be confirmed in the quotation.

Can the gantry move with a suspended load?

Ask for the written travel instructions and limits for the exact model and configuration. A portable label or wheels alone do not establish whether loaded travel is permitted.

Do I need complete specifications to contact you?

No. Send a brief job description and a way to reach you. Dimensions, drawings and the remaining details can follow during the quotation discussion.