BUYING GUIDE

What should a crane quotation include?

A quotation states the equipment, the included items and the work each party performs. Installation, documents, inspection and delivery scope are separate line items, so agree them in writing before you place the order.

Compare the same lifting task

QuestionPortable gantryJib crane
Working areaCheck clear span, hook travel and the proposed frame positions.Check working radius, rotation area and obstructions.
InstallationReview floor, footprint, access and assembly requirements.Review the supporting floor, foundation or structure and anchors.
Moving between jobsConfirm how the exact frame may be repositioned.Compare the fixed installation position with all lifting points.
QuotationUse the same load and task. Compare equipment, hoist, controls, supporting works, documents and delivery scope.

Who installs the equipment, and who is responsible for it afterwards?

Supply and installation can be quoted separately, and a delivered machine is not an installed one. Ask in writing who assembles the equipment, who supervises the work, who connects the power feed, who checks it before first use, and who signs the handover. Responsibility follows the party that accepts that task, so a missing line in the quotation is not an assumption you can rely on.

Which documents should be agreed before you order?

Drawings, operating instructions, inspection or test records, material and finish evidence, and a packing list are separate deliverables. Ask which of them are included, who issues them and in which language. State the destination country and any standard your project must satisfy early; the documents a site accepts differ between markets, and local approval stays with your project.

What should arrive with the crane, and when does the warranty start?

The documents agreed before the order are not the same as the package that arrives. At handover, check the shipment against the packing list and the document list, and record the date you accepted the equipment. Tie the warranty to that acceptance date, not to the shipment date, so transit time does not use up the cover before the crane is running.

  • Packing list and shipment marks: match every package, crate and loose item before signing.
  • General arrangement and as-built drawings: revision, span, hook height and the configuration actually supplied.
  • Operating and maintenance instructions: the language, the model covered, and the inspection intervals the manual states.
  • Test and inspection records: what was tested, by whom, against which criteria, and the result.
  • Spare parts list and part numbers: confirm the list matches the model and serial number on the nameplate.
  • Nameplate and serial number: photograph them and record them with the handover date.
  • Warranty terms and start date: written down, with the start tied to handover or acceptance rather than shipment.

For a spare-parts enquiry, send the nameplate photo, model and serial number, the part number and description from the parts list, the quantity, the date you need it and the delivery address. Add a photo of the worn or damaged part and say whether the crane is stopped. Ask for the part to be identified against the serial number, not against a similar crane in the same bay.

What happens if the equipment fails inspection?

Price and delivery tend to get attention during negotiation; what happens when goods do not meet the agreed requirements often does not. Agree the acceptance criteria, the stage at which inspection happens, who attends, and the remedy if something fails. Cover repair, replacement or credit, the time allowed, and who carries the cost of return freight or re-inspection. Written terms for this are easier to agree before payment than after arrival.

What the quotation should list line by line

Check the equipment and rating, the hoist and trolley, controls, power supply and any travel arrangement. Confirm which supporting works, foundations or structural checks are included and which are excluded. Then confirm documents, packing, delivery terms, lead time and payment stage. A single total price does not show which of these the supplier has actually accepted.

How to compare two quotations fairly

Use the same brief, the same required load and the same destination for both enquiries. Compare delivery terms, excluded works and the document package alongside the equipment line. A lower total is only comparable once the exclusions match; two quotations for the same job often differ in what each party does, not in what the crane is.

The eight items that explain a gap between two offers at the same rating, and the site values they depend on, are collected on the crane planning worksheet.

LET'S DISCUSS YOUR JOB

Reviewing a quotation now?

Send the quotation or the scope you are comparing. We can point out which items still need written confirmation.

WhatsApp our team ↗

Or email our team directly. If the form does not load, use email or WhatsApp.

Send your enquiry directly to our team. Our form service processes your message and we use your details to respond to this enquiry. If the security check does not appear after a few seconds, use the email or WhatsApp links below — your answers are copied into the message. Privacy & enquiries.

Security check not loading, or prefer a direct message? Send the same details by email or WhatsApp — your answers are copied into the message.

These links open your email app or WhatsApp. Review the message and send it there.

BEFORE YOU ENQUIRE

Questions about your next step

Does the quotation price include installation?

Do not assume it does. Ask for installation, supervision and handover to appear as an explicit item, or as a written exclusion. Supply-only and supplied-and-installed are different scopes with different responsibilities.

Can I ask for inspection before shipment?

Yes. Agree what will be inspected, at which stage, by whom and against which acceptance criteria, and record it before you place the order. Confirm who attends and what happens if the result is not accepted.

What if I do not know which documents my country requires?

State the destination country and the standard or authority your project must satisfy. We will clarify which documents can be supplied with the quotation. Approval for local installation and use remains with your project and its responsible parties.

Is the lowest quotation the cheapest option?

Only once the scope matches. Compare installation, supporting works, documents, packing and delivery terms on the same brief, then review the total. A lower equipment line with more exclusions can cost more in the end.