Applications

Start with your lifting application

Describe what you need to lift, where it starts and where it needs to go. Explore an application example to help prepare your enquiry.

START WITH THE TASK

What are you trying to lift or move?

These are planning starting points, not completed customer projects. Share your own load and layout to discuss suitability.

01

STEEL PLANT & FOUNDRY

Lifting in a steel plant

Slag, ladle and foundry handling: which arrangement suits each area and what decides the specification.

Read the application →
02

STEEL SERVICE CENTRE

Lifting in a steel service centre

Coil storage, line-side handling and loading: what decides the crane and what to send for a quotation.

Read the application →
03

SHIPYARD

Lifting in a shipyard

Block assembly, berth and workshop lifting: which arrangement fits, and what decides the specification.

Read the application →
04

PLANNING EXAMPLE

Lifting in a small workshop

Prepare a brief for a maintenance or assembly task. This is an application planning example, not a completed customer project.

Explore →

What lifting equipment suits foundry and heavy metal handling?

Match the arrangement to the handling cycle: an overhead travelling crane where a bay must lift anywhere; a jib crane or monorail for one repeated pouring or machine position; a magnet or grab, with the crane specified around the attachment, for scrap, slag and ingots with no lifting point; and a crane treated as a process tool — redundant braking, heat shielding, controlled lowering and a written emergency procedure — for ladles and pots.

Load and attachmentArrangement usually discussedWhat decides the specification
Flasks, moulds and castings that must be lifted anywhere in a bayOverhead travelling craneBay span, hook height, shakeout dust and heat, moulding-cycle duty
One pouring or machine position, repeated all shiftJib crane or monorail hoistCycle time, headroom at that point, foundation or supporting structure
Scrap, slag or ingots with no lifting pointMagnet or grab on a heavy-duty craneAttachment weight, release control, shock loading, duty cycle
Ladle or potCrane treated as a process toolRedundant braking, heat shielding, controlled lowering, written emergency procedure

In every case the heat, dust and duty decide the specification more than the tonnage does. Arrangements above are selection logic, not ratings: span, hook height and duty class are confirmed for the quoted configuration. The full area-by-area breakdown is on the steel plant and foundry application page.

Questions that come up in any application

Capacity, span, foundation, duty class and documents are the same decisions whether the crane serves a workshop, a service centre, a shipyard or a steel plant.

Have a different application?

Tell us what you need to lift and where it needs to go.

Discuss my requirements →