Project references
How to check a crane project reference
A reference is evidence when it matches your application and comes with the documents behind it. Use this page to decide what to ask for, and what a picture alone does not prove.
READING A REFERENCE
What a project reference can and cannot tell you
| What you are shown | What it confirms | What it does not confirm |
|---|---|---|
| A photo of a crane at work | The general arrangement that supplier builds | The rated capacity or duty class of that unit, or who supplied and installed it |
| A nameplate or a dimensional drawing | The configuration of that one unit | That your floor, headroom, power supply and lifting path suit the same unit |
| A packing list or delivery note | What left the supplier in that shipment | That installation, commissioning or inspection was part of the order |
A reference is useful when it matches your application, your environment and the scope of supply you are buying. Ask for the document that proves the point you care about, not the photo that looks closest.
CHECKLIST
Six documents to ask for when you check a reference
Each item answers a different question. A supplier who keeps the project record in one place can usually produce all six.
- The nameplate data of the unit actually supplied, with the configuration it belongs to.
- The general-arrangement or approval drawing issued for that unit.
- The inspection or load-test record, with the date and who carried it out.
- The scope of supply: equipment, hoist, controls, documents, packing, and the exclusions.
- Who installed and commissioned it, and who signed off the installation on site.
- The duty class and working environment as written in the documentation, not inferred from a picture.
None of these documents replaces the quotation for your own equipment. They show what a supplier is able to evidence.
Match the reference to your application
A reference from the wrong environment proves less than a specification from the right one. Start with the application closest to your own.
STEEL PLANT & FOUNDRY
Lifting in a steel plant
Slag, ladle and foundry handling: which arrangement suits each area and what decides the specification.
Read the application →02STEEL SERVICE CENTRE
Lifting in a steel service centre
Coil storage, line-side handling and loading: what decides the crane and what to send for a quotation.
Read the application →03SHIPYARD
Lifting in a shipyard
Block assembly, berth and workshop lifting: which arrangement fits, and what decides the specification.
Read the application →04PLANNING EXAMPLE
Lifting in a small workshop
Prepare a brief for a maintenance or assembly task. This is an application planning example, not a completed customer project.
Explore →PROJECT INFORMATION
What we publish, and what we ask first
Customer projects are shared only with the customer's permission, and the commercial terms behind them belong to those customers. We will answer specific questions about an application, a configuration or a document, and we will say clearly when a detail cannot be shared.
For your own enquiry the decisive evidence is different: the drawing and documents issued for the equipment proposed to you, checked against your floor, headroom, power supply and lifting path.
Product illustrations and application planning examples are labelled as such. They do not represent completed customer installations.