About
What we supply, and what we do not claim
The equipment we supply, the industries it is specified for, what is issued with an order, and the claims this site deliberately does not make.
EQUIPMENT
Four equipment families
Every page on this site belongs to one of four families. Each family page explains which member suits which job and what the installation depends on, before any model is proposed.
- Portable gantry cranes — a frame that stands over the load and is moved between lifting positions.
- Jib cranes — a rotating arm serving one workstation, pillar-mounted or fixed to a wall.
- Electric hoists — the lifting package, and the beam, trolley or monorail it runs on.
- Overhead cranes — travel across a bay on runway beams, where the building is part of the project.
Rated load, span, lifting height and the scope of supply are agreed for the configuration quoted, not taken from a family page.
APPLICATIONS
Where this equipment is specified
The lifting task changes with the area it serves, and so does the equipment. These four application pages describe the handling cycle, the environment and the site data that decide the arrangement.
- Small workshops and maintenance areas — lifting parts on and off machines where space and headroom are limited.
- Steel plants and foundries — slag, ladle and charging work, planned by area rather than by tonnage alone.
- Steel service centres — coil, plate and bar handling, planned at the worst case rather than the average.
- Shipyards — block assembly and berth work, with wind, salt and track settlement in the specification.
These are planning guides. They are not a list of completed customer projects, and they do not name customers.
WHAT IS ISSUED
What leaves with an order
The equipment is built for the order, so the paperwork is part of the supply, not an afterthought. A quotation should name each of these, or say that it is excluded.
- The general-arrangement drawing for the unit proposed
- The scope of supply: crane or frame, hoist, trolley, controls, and the items left out
- The operating and maintenance documents issued with the equipment, and their language
- The packing arrangement, and the shipping terms agreed for your destination
- Who designs the foundation, runway or bracket, and who commissions the equipment on site
Which of these are included, in what language, and on what shipping terms, is stated in the quotation for your order. The site publishes no delivery date before the configuration is fixed.
WHAT WE DO NOT CLAIM
The claims this site deliberately does not make
- No published figures for price or delivery. Both depend on the configuration, and both are stated in the quotation rather than on a page.
- No certification claim on a product page. Any certificate that applies to your order is named in the quotation; registration and periodic inspection at your site are set by your local authority.
- No table of standard values. The guides describe how a classification is calculated and which values to collect — not the table figures themselves.
- No photographs presented as customer installations. Images are product views or planning examples; they do not establish a load test, a factory or a completed project.
- No customer names without permission. Where a reference is shared, it is limited to what the customer has agreed to, and their commercial terms stay with them.
What the site does publish is the reasoning: which data decides an arrangement, what a quotation has to state, and where a value has to come from your own drawing or standard.
SCOPE OF SUPPLY
What a lifting quotation covers, and what to confirm separately
| Item | What the quotation should state | If it is not stated |
|---|---|---|
| Crane or gantry, hoist, trolley and controls | The included items, power supply, control arrangement and any options | Ask for the list; a package that is not written is not included |
| Drawings and operating documents | Which drawings, in which language, and what your inspector will expect | Ask before ordering, not after delivery |
| Foundations, runway beams and building steelwork | Whether design and supply are in scope | Confirm per project; do not assume they are included |
| Electrical supply, isolator and cable route | Who provides, who connects and to what point | Confirm per project |
| Installation, commissioning and inspection | Whether included, and who carries them out | Confirm per project |
| Local registration, permits and periodic inspection | What your authority requires at your site | Your side, unless the quotation says otherwise |
This table is the list of questions we use when preparing a quotation. It is a checklist, not a statement that any item is included in every order.
What happens after you send the job
You describe the load, the workspace and the destination; we ask for whatever is missing; you receive the proposed arrangement, a drawing, the scope of supply and a quotation. Send the job when you are ready, or read what a quotation should state before you compare offers. The crane buying FAQ answers the questions that come up first.
Everything else on this site is written to make that conversation shorter: which values decide an arrangement, and which of them you can only get from your own drawing, your standard or your supplier. Treat a figure that does not come with your drawing or your quotation as a question to ask.
