MONORAIL & TROLLEY HOIST
Monorail hoist: fitting an I-beam trolley
A trolley hoist is only as good as the beam it runs on. The trolley has to match the beam profile, the flange the wheels run on, the headroom and the loads the beam can carry. This page is a measuring and selection guide, not a product listing: it sets out the six dimensions to record, how to choose between a fixed hoist and a trolley, and what to check before adding a trolley to an existing monorail.
Fixed hoist or trolley hoist: start with the travel
The first decision is not the trolley model. It is whether the load has to move horizontally at all. A fixed hoist lifts at one point. A trolley hoist adds a carriage that runs along the beam, so the load can be positioned between the end stops. That one difference decides the beam interface, the headroom and the power arrangement.
| Question | Fixed hoist | Trolley hoist |
|---|---|---|
| Lifting positions | One position under the fixing | Any position along the beam, within the end stops |
| Horizontal travel | None | Along the beam; the trolley carries the hoist |
| Headroom | The hoist hangs from the fixing; no trolley body below the beam | The trolley body sits between the beam and the hook, so it uses height |
| Beam interface | A fixing point sized for the hoist | Wheel gauge, flange width and profile, plus end stops and travel limits |
| Power and controls | Supply to one position | Supply along the travel, with a festoon or conductor system if motorized |
| When it fits | The load only needs to rise and lower at one spot | The load has to move along the beam between pickup and set-down |
If the load only needs to rise and lower at one spot, a trolley adds height and hardware for no benefit. If it has to travel, a fixed hoist becomes a compromise with a load that is dragged or carried by hand.
The six dimensions to record at the beam
Measure the beam you have, not the beam on the drawing. Extensions, repairs, worn flanges and previous modifications are common on existing monorails, and a trolley is selected against the section that is actually there.
| Dimension | How to record it | Why the trolley depends on it |
|---|---|---|
| Beam profile | Sketch the section; photograph the end with a scale | A trolley wheel runs on the flange, and a similar overall depth can hide a different flange and web |
| Flange width | Tape or caliper at several points along the beam | Sets the wheel gauge and the clearance the trolley needs |
| Flange thickness | Caliper at the running surface, clear of wear and paint | The wheel sits on this thickness; wear or a built-up surface changes the interface |
| Beam depth and web thickness | Caliper on the web, away from joints and repairs | Sets the space below the beam and the section the load has to be checked against |
| Clear headroom | From the lowest point of the beam to the highest obstruction below, plus the hook height you need | The trolley body and hook block consume height before the load is added |
| Suspension points and end stops | Tape between hangers, and from the last useful hook position to each stop | Defines the beam span between supports and the travel actually available |
Record each value with the tape or caliper used, and photograph the beam end with a scale in the frame.
How to choose the trolley for the beam
The trolley is matched to the measured flange and to the way the load has to move. Work through these points before comparing models.
- Wheel arrangement and gauge must match the measured flange, not the nominal beam size.
- Trolley height reduces hook height; check the trolley envelope on the drawing, not only the hoist body.
- Travel can be hand-pushed, hand-chain or motor-driven; the choice follows distance, frequency and how precisely the load must stop.
- The beam and its supports have to carry the wheel loads of the loaded trolley; that check belongs to the beam owner or the structural engineer.
- Outdoor, dusty, washdown or food environments change the material, finish and enclosure, not the measuring list.
- End stops and buffers are part of the travel arrangement, not an accessory added later.
Do not select a trolley from a photo of the beam. The flange is the interface, and it is the part a picture is least able to confirm.
Adding a trolley to an existing monorail
A monorail that carried a fixed hoist may never have been assessed for a trolley. The added carriage changes the wheel loads, the hook approach and the travel envelope, so check the installation as a system.
- Section and condition: corrosion, flange wear, cracks, welded repairs and previous drillings.
- Capacity of the beam and supports for the new wheel loads, including the trolley and hoist weight.
- Headroom and hook height after the trolley is added.
- End stops, buffers and travel limits.
- Power feed, earthing and controls if the trolley is motorized.
- Clearance to structures, other cranes, doors and services along the travel.
- Documents: beam drawing, support details, existing hoist nameplate and any previous inspection record.
What to send for a quotation
A sketch with the six dimensions is more useful than a catalogue page. Mark unknown values as unknown; a guessed flange width is worse than a blank.
- Sketch of the beam section with the six dimensions, and the beam span between supports.
- Photos of the beam end profile and each suspension point, with a tape or scale in the frame.
- Total travel length, and the distance from each end stop to the last useful hook position.
- Load, attachment, required hook height and lifting frequency.
- Fixed or travelling; hand-pushed, hand-chain or motorized.
- Power supply details if motorized.
- Environment and destination country.
What this page does not decide
This page does not decide the capacity of the beam, the adequacy of its supports or the trolley model. Those depend on the measured section, the wheel loads and the project's structural check. The beam and support design stay with the structural engineer or the party that owns the monorail; the trolley and hoist are confirmed against the measurements you send.
No beam size, trolley model or capacity figure is published here. A table copied from a web page cannot confirm that the beam above your load is adequate.
LET'S DISCUSS YOUR JOB
Fitting a trolley hoist to an existing beam?
Send a sketch of the beam section, the span between supports and the hook height you need. We can point out which dimensions are still missing.
WhatsApp our team ↗Or email our team directly. If the form does not load, use email or WhatsApp.
COMMON QUESTIONS
Questions about monorail hoist: fitting an i-beam trolley
Which beam section does a trolley hoist need?
The trolley has to match the flange the wheels run on, not only the nominal beam depth. Send a sketch of the section with the flange width, flange thickness, beam depth and web thickness, plus the span between supports. The trolley and the beam check are confirmed against those measurements.
Can I add a trolley hoist to an existing monorail?
Usually, if the flange, headroom, end stops and beam capacity check out. Measure the beam first and have the beam and supports checked for the loaded trolley's wheel loads. A monorail that carried a fixed hoist may never have been assessed for a trolley.
Push trolley or motorized trolley?
Hand-pushed travel suits occasional, short moves where the operator can reach the load. Motorized travel suits long runs, frequent moves or loads that must be positioned precisely. Both need the same beam measurements; motorized travel also needs a power feed along the beam.
How much headroom does a trolley hoist need?
Enough for the trolley body, the hook block, the attachment and the load. Measure from the lowest point of the beam, not from the roof, and ask for the trolley envelope on the drawing. There is no single figure that fits every beam and hook height.
Do you supply the monorail beam?
The scope of supply is confirmed in the quotation. The beam, its hangers and the building connection may be separate from the hoist and trolley package, and the structural check stays with the party responsible for the beam.