Trackless gantry on a white background with right-hand beam branding and continuous red cables
White-background product overview

GANTRY CRANES / TRACKLESS

Trackless mobile gantry crane

A mobile gantry category with motorized wheel assemblies and demountable frame configurations. Explore the supplied images and discuss the arrangement for your lifting job.

Capacity, dimensions, steering arrangement and operating limits are confirmed for the quoted configuration.

YOUR APPLICATION

Match the equipment to your job

Discuss a gantry arrangement when lifting positions are spread across the floor and powered movement is part of your requirement.

Details that shape your configuration

Load path

Mark pickup and set-down points and the route between them.

Floor and access

Share floor photos, slopes, thresholds, aisle widths and turning space.

Drive and controls

Describe how you want to position the frame and load; confirm steering, controls and power with the proposal.

Unknown details can be discussed. Ratings, dimensions and included equipment are confirmed for the exact configuration quoted.

CAPACITY

trackless gantry configurations

Series coverage, not the specification of a single machine. Blank cells are values this page does not publish.

These are separate configurations, not a capacity range.

ModelsRated capacitySpan or reachLifting heightDuty class
Configuration2 t
Configuration5 t

Other capacities and sizes are built to order and quoted individually.

CATEGORY GALLERY

Configurations & component details

AI-edited product illustrations based on supplied images. This gallery shows different configurations, not a single verified model. Visible source ratings apply only to the equipment pictured. Workshop scenes do not establish factory ownership or a customer installation.

Plan the travel arrangement

Share the required load, pickup and set-down positions, floor conditions, aisle width and delivery destination. Confirm the proposed wheel drive, steering and controls, working dimensions, hoist package and assembly instructions in the quotation.

Travel with a suspended load and operating limits require written instructions for the exact equipment supplied. These illustrations are not engineering drawings.

Compare the height-adjustable gantry →

Before you enquire

Rated load, span, lifting height and the scope of supply are agreed for the configuration quoted; the enquiry is where those values are set for your site.

Does trackless mean it can travel anywhere?

No. The proposed floor conditions, travel route, turning space and movement limits must be reviewed for the exact configuration. Wheel-drive images alone do not establish suitability.

How do I describe the load and working span?

State the item to be lifted, its approximate weight and the clear span that must fit between the uprights. Mark the pickup and set-down positions and the route between them. Rated capacity, clear opening and trolley travel are confirmed for the proposed configuration.

Can the frame be configured to my site?

Describe the floor, slopes, thresholds, aisle widths and turning space. The arrangement is discussed against your own layout, and the proposed working dimensions, drive and limits are confirmed in the quotation.

Does a trackless gantry need a fixed track?

No track is installed for the floor. Wheeled assemblies carry the frame instead, so floor conditions, the travel route and turning space must be reviewed for the exact configuration.

What should I send with my enquiry?

The load, pickup and set-down positions, floor conditions, aisle width, whether you need a hoist and trolley, and the delivery country. Photos of the floor and access route help. Unknown details can be discussed.

Compare another arrangement

LET'S DISCUSS YOUR JOB

Discuss a trackless gantry

Describe the load, floor conditions, working area and delivery destination. We will clarify the proposed configuration.

WhatsApp our team ↗

Or email our team directly. If the form does not load, use email or WhatsApp.

Send your enquiry directly to our team. Our form service processes your message and we use your details to respond to this enquiry. If the security check does not appear after a few seconds, use the email or WhatsApp links below — your answers are copied into the message. Privacy & enquiries.

Security check not loading, or prefer a direct message? Send the same details by email or WhatsApp — your answers are copied into the message.

These links open your email app or WhatsApp. Review the message and send it there.