SHIPYARD

Cranes for shipyards and block assembly

Shipyard lifting is two different problems in one yard. Outdoors, large blocks are moved in wind, on ground that settles, sometimes with two cranes sharing a load. Indoors, sub-blocks and pipe spools are mated with repetitive precision. Name the area and the lift before discussing tonnage, because the two need different arrangements.

Where lifting happens in a shipyard

A yard is a chain of lifting points from the steel stock to the water. Each link has its own arrangement, and the crane chosen for one will rarely be right for the next.

AreaWhat is handledArrangement usually discussed
Steel stock and panel linePlates, profiles, welded panelsOverhead travelling crane with a magnet or vacuum spreader; gantry over an outdoor stock yard
Block assembly hallSub-blocks and assembled blocksOverhead travelling crane, often two cranes working in tandem; gantry where there is no roof structure
Grand assembly and outdoor yardLarge blocks and modulesGantry or portal crane on rails; crawler or mobile crane for turning and erection
Blasting and paintingCoated blocksCrane with clean lifting points and controlled travel, so the coating survives the move
Berth and outfittingModules, engines, pipe spoolsPortal crane at the berth; jib crane and monorail inside machinery spaces
Engine room and pump roomPumps, generators, spoolsMonorail hoist, jib crane, or a designed temporary lifting beam
Quay and load-outBlocks and modules onto the vesselHeavy-lift crane or a skidding arrangement; the crane is only one part of the route

Why a shipyard crane is not a workshop crane

  • Wind acts on the area of a block, not only its weight: a large panel behaves as a sail and limits the lift long before the crane reaches its rated load
  • Salt and humidity reach the structure, the ropes, the brakes and the electrical enclosures, so protection and inspection intervals follow the exposure
  • Outdoor track settles: a gantry rail that was aligned at handover can go out of line over a long travel run
  • Blocks are turned and upended, so the load on the lifting points changes during the lift and the rating has to hold at every stage
  • Two cranes may share one block, which needs a defined arrangement, a load share that is stated, and one person directing the lift
  • Travel distances are long and the duty is high during a build programme, then low between programmes: the duty basis has to reflect that pattern
  • Maintenance access at height is part of the design, not an afterthought: a crane that cannot be reached safely will be inspected late

The wind area of the load, not the tonnage, is what usually limits an outdoor block lift. The crane supplier and the lift plan have to use the same figure, or the two documents will disagree on the day of the lift.

Lifting a block: what the lift plan has to settle

ItemWhy it mattersWho normally provides it
Block weight and centre of gravitySets the share on each lifting point and the stability while the block hangsThe block designer
Lifting points and strongbacksThe block is lifted through designed points, not by a sling around the shellThe block designer, to the yard's lifting standard
Number of cranesTwo cranes share a load only with a defined arrangement and one person directingThe lift plan
Turning or upendingThe load and its geometry change during the lift, so the capacity has to be checked at each stageThe lift plan, with the crane supplier
Wind limitA large block is a sail, and the limit belongs to the lift, not to the crane aloneThe yard's safety procedure
Ground or track conditionA rail-mounted gantry depends on the track; a mobile crane depends on bearing capacity under the outriggersThe yard engineer
Clear routeOther cranes, buildings, power lines and stock in the travel pathThe lift plan

The crane is one line in the lift plan. If nobody owns the plan, the crane supplier is being asked to guarantee a lift it does not control.

Which arrangement fits which part of the yard

ArrangementStrong atWhat to check
Overhead travelling crane in a hallCovering a bay and mating sub-blocks with precisionRunway and roof structure, hook height above the tallest block, tandem control, clearance to the roof
Gantry or portal crane on railsOutdoor assembly and storage over long travelTrack foundation and settlement, rail alignment over the full length, wind, drainage
Mobile or crawler craneTurning, erection and one-off liftsGround bearing, radius at the working load, site access, and who owns the lift plan
Jib crane or monorail hoistEngine room, pump room and pipe shopHeadroom, foundation or structure, and the route the monorail has to follow
Winch and temporary arrangementSlipway and load-out where no crane fitsRated arrangement, anchor design, and the person who designs and signs it off

What to send for a shipyard crane quotation

Send what you know. The gaps can be discussed, but the block, the environment and the lift plan cannot be guessed by a supplier.

  • Block weight range, the largest block dimensions and its centre of gravity
  • Lifting points and strongbacks: designed by whom, and to which standard
  • Hall dimensions, span and the hook height above the tallest block
  • Indoor or outdoor, with wind, salt, temperature and humidity at the working position
  • Whether two cranes ever share a load, and how that lift is directed
  • Travel length, track or floor condition, and whether the ground is known to settle
  • Power supply, control position, and the speeds the mating work needs
  • Documents your project, class society or insurer requires, and the destination country
  • Scope split: structure, runway or track, foundations, power to the crane, and the lift plan

If a classification society or the project authority has to review the lifting arrangement, say so in the first message. It changes the documents and the review route, and it is cheaper to plan for it than to discover it at handover.

Installation, inspection and handover

A shipyard crane is inspected against a programme from the first shift, and an outdoor one is inspected against the weather as well. Fix the route before the crane arrives.

LET'S DISCUSS YOUR JOB

Handling blocks, modules or shipyard loads?

Tell us the block size, where it is assembled and where it has to go. We can discuss the arrangement and the data the design depends on.

WhatsApp our team ↗

Or email our team directly. If the form does not load, use email or WhatsApp.

Send your enquiry directly to our team. Our form service processes your message and we use your details to respond to this enquiry. If the security check does not appear after a few seconds, use the email or WhatsApp links below — your answers are copied into the message. Privacy & enquiries.

Security check not loading, or prefer a direct message? Send the same details by email or WhatsApp — your answers are copied into the message.

These links open your email app or WhatsApp. Review the message and send it there.

COMMON QUESTIONS

Questions about lifting in a shipyard

What crane is used in a shipyard?

Several, because a yard is a chain of lifting points. Block assembly halls usually use overhead travelling cranes, often two working in tandem; outdoor assembly and storage use gantry or portal cranes on rails; turning and erection use crawler or mobile cranes; engine rooms and pipe shops use jib cranes and monorail hoists. The arrangement follows the area and the lift, not a single yard-wide choice.

Can two cranes lift one block together?

Only with a defined arrangement: stated lifting points, a load share each crane is rated for, synchronised control or a written procedure, and one person directing the lift. Load sharing is never assumed to be equal, and the plan has to say what happens if one crane stops. The lift plan, not the crane supplier alone, owns that arrangement.

What decides the crane for outdoor block assembly?

Wind area, track or ground condition, hook height, travel length and duty, in that order for most yards. A large block presents a sail area that limits the lift earlier than the rated load does, and a rail-mounted gantry depends on a track that can settle over a long run. Tonnage alone tells you very little about an outdoor block crane.

Do you supply shipyard cranes?

We can quote overhead, gantry and portal arrangements for shipyard and block-assembly duty, and discuss the hoist and control package. The block design, the lifting points and the lift plan stay with the yard and its engineers. We confirm the proposed configuration, the duty basis and the data the design depends on before the specification is fixed.

Why does salt matter for a crane specification?

Salt and humidity reach the structure, the rope, the brakes and the electrical enclosures. That changes the protection specified, the materials and fasteners, and how often the crane has to be inspected. A crane specified for a dry inland workshop will corrode early outdoors, and the failures will appear at the points that are hardest to reach.

What documents should a shipyard crane quotation state?

Drawings, operating instructions, test and inspection records and a spare parts list, as agreed. If the project or a class society requires design review or specific documentation, state it in the enquiry, because the review route and the document set differ between yards and markets. Do not assume the standard supply package covers it.