SHIPYARD
Cranes for shipyards and block assembly
Shipyard lifting is two different problems in one yard. Outdoors, large blocks are moved in wind, on ground that settles, sometimes with two cranes sharing a load. Indoors, sub-blocks and pipe spools are mated with repetitive precision. Name the area and the lift before discussing tonnage, because the two need different arrangements.
Where lifting happens in a shipyard
A yard is a chain of lifting points from the steel stock to the water. Each link has its own arrangement, and the crane chosen for one will rarely be right for the next.
| Area | What is handled | Arrangement usually discussed |
|---|---|---|
| Steel stock and panel line | Plates, profiles, welded panels | Overhead travelling crane with a magnet or vacuum spreader; gantry over an outdoor stock yard |
| Block assembly hall | Sub-blocks and assembled blocks | Overhead travelling crane, often two cranes working in tandem; gantry where there is no roof structure |
| Grand assembly and outdoor yard | Large blocks and modules | Gantry or portal crane on rails; crawler or mobile crane for turning and erection |
| Blasting and painting | Coated blocks | Crane with clean lifting points and controlled travel, so the coating survives the move |
| Berth and outfitting | Modules, engines, pipe spools | Portal crane at the berth; jib crane and monorail inside machinery spaces |
| Engine room and pump room | Pumps, generators, spools | Monorail hoist, jib crane, or a designed temporary lifting beam |
| Quay and load-out | Blocks and modules onto the vessel | Heavy-lift crane or a skidding arrangement; the crane is only one part of the route |
Why a shipyard crane is not a workshop crane
- Wind acts on the area of a block, not only its weight: a large panel behaves as a sail and limits the lift long before the crane reaches its rated load
- Salt and humidity reach the structure, the ropes, the brakes and the electrical enclosures, so protection and inspection intervals follow the exposure
- Outdoor track settles: a gantry rail that was aligned at handover can go out of line over a long travel run
- Blocks are turned and upended, so the load on the lifting points changes during the lift and the rating has to hold at every stage
- Two cranes may share one block, which needs a defined arrangement, a load share that is stated, and one person directing the lift
- Travel distances are long and the duty is high during a build programme, then low between programmes: the duty basis has to reflect that pattern
- Maintenance access at height is part of the design, not an afterthought: a crane that cannot be reached safely will be inspected late
The wind area of the load, not the tonnage, is what usually limits an outdoor block lift. The crane supplier and the lift plan have to use the same figure, or the two documents will disagree on the day of the lift.
Lifting a block: what the lift plan has to settle
| Item | Why it matters | Who normally provides it |
|---|---|---|
| Block weight and centre of gravity | Sets the share on each lifting point and the stability while the block hangs | The block designer |
| Lifting points and strongbacks | The block is lifted through designed points, not by a sling around the shell | The block designer, to the yard's lifting standard |
| Number of cranes | Two cranes share a load only with a defined arrangement and one person directing | The lift plan |
| Turning or upending | The load and its geometry change during the lift, so the capacity has to be checked at each stage | The lift plan, with the crane supplier |
| Wind limit | A large block is a sail, and the limit belongs to the lift, not to the crane alone | The yard's safety procedure |
| Ground or track condition | A rail-mounted gantry depends on the track; a mobile crane depends on bearing capacity under the outriggers | The yard engineer |
| Clear route | Other cranes, buildings, power lines and stock in the travel path | The lift plan |
The crane is one line in the lift plan. If nobody owns the plan, the crane supplier is being asked to guarantee a lift it does not control.
Which arrangement fits which part of the yard
| Arrangement | Strong at | What to check |
|---|---|---|
| Overhead travelling crane in a hall | Covering a bay and mating sub-blocks with precision | Runway and roof structure, hook height above the tallest block, tandem control, clearance to the roof |
| Gantry or portal crane on rails | Outdoor assembly and storage over long travel | Track foundation and settlement, rail alignment over the full length, wind, drainage |
| Mobile or crawler crane | Turning, erection and one-off lifts | Ground bearing, radius at the working load, site access, and who owns the lift plan |
| Jib crane or monorail hoist | Engine room, pump room and pipe shop | Headroom, foundation or structure, and the route the monorail has to follow |
| Winch and temporary arrangement | Slipway and load-out where no crane fits | Rated arrangement, anchor design, and the person who designs and signs it off |
What to send for a shipyard crane quotation
Send what you know. The gaps can be discussed, but the block, the environment and the lift plan cannot be guessed by a supplier.
- Block weight range, the largest block dimensions and its centre of gravity
- Lifting points and strongbacks: designed by whom, and to which standard
- Hall dimensions, span and the hook height above the tallest block
- Indoor or outdoor, with wind, salt, temperature and humidity at the working position
- Whether two cranes ever share a load, and how that lift is directed
- Travel length, track or floor condition, and whether the ground is known to settle
- Power supply, control position, and the speeds the mating work needs
- Documents your project, class society or insurer requires, and the destination country
- Scope split: structure, runway or track, foundations, power to the crane, and the lift plan
If a classification society or the project authority has to review the lifting arrangement, say so in the first message. It changes the documents and the review route, and it is cheaper to plan for it than to discover it at handover.
Installation, inspection and handover
A shipyard crane is inspected against a programme from the first shift, and an outdoor one is inspected against the weather as well. Fix the route before the crane arrives.
LET'S DISCUSS YOUR JOB
Handling blocks, modules or shipyard loads?
Tell us the block size, where it is assembled and where it has to go. We can discuss the arrangement and the data the design depends on.
WhatsApp our team ↗Or email our team directly. If the form does not load, use email or WhatsApp.
COMMON QUESTIONS
Questions about lifting in a shipyard
What crane is used in a shipyard?
Several, because a yard is a chain of lifting points. Block assembly halls usually use overhead travelling cranes, often two working in tandem; outdoor assembly and storage use gantry or portal cranes on rails; turning and erection use crawler or mobile cranes; engine rooms and pipe shops use jib cranes and monorail hoists. The arrangement follows the area and the lift, not a single yard-wide choice.
Can two cranes lift one block together?
Only with a defined arrangement: stated lifting points, a load share each crane is rated for, synchronised control or a written procedure, and one person directing the lift. Load sharing is never assumed to be equal, and the plan has to say what happens if one crane stops. The lift plan, not the crane supplier alone, owns that arrangement.
What decides the crane for outdoor block assembly?
Wind area, track or ground condition, hook height, travel length and duty, in that order for most yards. A large block presents a sail area that limits the lift earlier than the rated load does, and a rail-mounted gantry depends on a track that can settle over a long run. Tonnage alone tells you very little about an outdoor block crane.
Do you supply shipyard cranes?
We can quote overhead, gantry and portal arrangements for shipyard and block-assembly duty, and discuss the hoist and control package. The block design, the lifting points and the lift plan stay with the yard and its engineers. We confirm the proposed configuration, the duty basis and the data the design depends on before the specification is fixed.
Why does salt matter for a crane specification?
Salt and humidity reach the structure, the rope, the brakes and the electrical enclosures. That changes the protection specified, the materials and fasteners, and how often the crane has to be inspected. A crane specified for a dry inland workshop will corrode early outdoors, and the failures will appear at the points that are hardest to reach.
What documents should a shipyard crane quotation state?
Drawings, operating instructions, test and inspection records and a spare parts list, as agreed. If the project or a class society requires design review or specific documentation, state it in the enquiry, because the review route and the document set differ between yards and markets. Do not assume the standard supply package covers it.