EQUIPMENT COMPARISON
Portable gantry crane vs jib crane
Compare how the load must travel through your workspace, then review the supporting structure and installation requirements of each proposed model. Share your layout before committing to a gantry or jib arrangement.
Compare the same lifting task
| Question | Portable gantry | Jib crane |
|---|---|---|
| Working area | Check clear span, hook travel and the proposed frame positions. | Check working radius, rotation area and obstructions. |
| Installation | Review floor, footprint, access and assembly requirements. | Review the supporting floor, foundation or structure and anchors. |
| Moving between jobs | Confirm how the exact frame may be repositioned. | Compare the fixed installation position with all lifting points. |
| Quotation | Use the same load and task. Compare equipment, hoist, controls, supporting works, documents and delivery scope. | |
Start with the work coverage
Mark the pickup and set-down positions. Ask the gantry supplier to show the working span and proposed travel path. Ask the jib supplier to show the working radius and rotation area. Compare those drawings with the same site layout.

Ask what the supporting structure must carry
A portable gantry transfers the load through its frame and wheels or feet to the floor. A jib crane transfers it through the mast, bracket or foundation. Ask each supplier for the support reactions, floor or foundation requirements and the installation scope for the quoted model. Use the same required load and your own layout for both enquiries.
Compare installation requirements
For each option, ask what supports the equipment and what checks the floor, building or foundation needs. Review access, obstructions and installation scope with the responsible supplier before selecting a model.
Compare the complete quotation
Use the same required load and job description for both quotations. Check hoist, trolley, controls, installation work and delivery scope. A lower equipment price alone does not establish the total project cost.
LET'S DISCUSS YOUR JOB
Not sure which arrangement fits?
Describe the lifting positions and your space. We can discuss the two options with you.
WhatsApp our team ↗Or email our team directly. If the form does not load, use email or WhatsApp.
BEFORE YOU ENQUIRE
Questions about your next step
Which option costs less?
Request quotations against the same job requirements, including the supporting works and delivery scope. We do not publish a price comparison without those project details.
How do I compare floor loading between the two options?
Ask each supplier for the loads the quoted equipment applies to the floor or foundation, together with the required floor or structural checks. Compare those figures for the same load and the same site layout. Do not estimate support requirements from a product photo.
Can I use one load rating for both quotations?
Use the same required load and job description in both enquiries. Rated capacity, duty and operating limits remain specific to the model quoted, so confirm them on the supplier datasheet and dimensional drawing.
What should I send for an initial discussion?
A description of the load, the pickup and set-down positions, available space and delivery country is enough to start. Send a layout or photos during follow-up if available.