SLAG HANDLING
Slag Cranes: Attachment, Environment and Duty Selection
A slag crane is specified in three steps, and in this order: the attachment, the environment the equipment works in, and the duty class each mechanism is calculated from. Capacity comes after those three, because a crane sized on tonnage alone will be wrong where the heat path, the wear and the cycle decide how long it lasts. This page is the selection procedure, not a product listing.
The order to decide in
Most slag crane enquiries start with a capacity and work outwards. That order hides the three decisions that actually shape the machine. Work through them the other way round and the capacity becomes an output rather than an input. In practice the machines serve foundry and steel mill work: slag drawn from a furnace, molten slag carried in a pot, hot slag tipped at a pit, and cooled slag dug in the yard. A ladle crane carries molten metal on a process cycle; a slag crane carries what comes off that cycle, so the two are specified separately.
- Attachment first: a grab, a magnet, a pot-handling arrangement or a hook with a dedicated sling each load the crane in a different way.
- Environment second: where the heat, the dust, the steam and the splash reach decides what has to be shielded, enclosed or moved away.
- Duty third: the class of each mechanism follows from the cycle, and it is calculated, not chosen from a label.
- Capacity and dimensions last: they follow from the attachment's own weight, the load it carries and the height the load has to reach.
Which area of the plant the crane serves — charging bay, melting shop, cast house, slag pit or yard — changes the starting point. The application page maps those areas; this page takes one of them and specifies the machine.
Step one: the attachment decides the crane
Two cranes with the same rated capacity behave differently under a grab than under a hook, because the grab adds its own weight, pulls sideways while it digs, and puts the working point below the hook. Decide the attachment before anything else, and make the quotation state the attachment's own rating separately from the crane's.
| Question | Grab or clamshell | Magnet | Hook with a dedicated sling or pot arrangement |
|---|---|---|---|
| What it handles | Loose, cooled or semi-solid slag dug from a pit or a stockpile | Ferrous pieces and skulls that respond to a magnet | Pots, boxes, ingots, and loads that already have a lifting point |
| What it gains | Reach into a heap, and a release the operator controls | A fast pick and drop with no slinging | The widest range of loads, and a direct read of what is on the hook |
| What it costs | Its own weight, more headroom lost, and side loads while digging | The load depends on the material; hot or mixed material may not hold | Slinging time on every lift, and a heat path straight to the hook and rope |
| Where the heat reaches | The grab is in the material; the hoist sits above it | The magnet and its cable are the closest items to the load | The sling carries heat up to the hook, the rope and the hoist |
| What the quotation must state | Grab type, its own duty rating, the closing arrangement, and where the operator works from | Magnet size, its supply and control, and how the cable is protected and handled | The sling or pot arrangement for the working temperature, and what shields the hook |
| What catches people out | Treating the grab as an accessory: the digging load and the shock reach the structure | Assuming the rated capacity applies to every load, when holding depends on the material | Assuming a general sling is adequate, when the heat path is the whole problem |
No capacity, span or temperature value is given here. Those values come from the process data and from the design proposed for your site.
Ask who states the capacity of the complete assembly — crane, attachment and load together. A crane rated for a load and a grab rated for the same load do not add up to a working combination, and the difference belongs in writing.
Step two: heat and dust decide more of the crane than the load does
Slag bays fail equipment at the parts closest to the radiant face, and the radiant face is not in the same place in every bay. Take the list below item by item, and decide for each one whether it is set back, shielded, enclosed or simply accepted as a wear item.
| Item | What reaches it | What to require |
|---|---|---|
| Hoist | Radiant heat from the pit, the pot or the runner; dust settling on the frame | Its position relative to the radiant face, and what shields it. If it cannot be set back, say so in the enquiry |
| Rope or chain | Direct radiation, hot splash, and dust packed into the links or between the wires | The specification for the working temperature, the shielding, and the inspection points that follow from it |
| Cables, festoon and collectors | Heat, abrasion, and dust building up on the run | A route away from the radiant face or behind a shield, and how the run is supported and kept clean |
| Brake | Heat conducted from the load side; dust on the friction surfaces | The brake arrangement and how it is inspected and adjusted with the crane in place |
| Panels and cabinets | Fine dust, steam, and heat radiated from the bay | Where they are mounted, and how they are kept clean and cool enough to work |
| Operator position | Heat, glare, fume and dust at the working point | Cabin with cooling and filtration, or radio control from a position that can see the grab and the pit |
| Walkway and access | Heat below, dust and spillage above | Whether a person can reach the hoist, the brake and the panel without stopping the process |
| Structure and fastenings | Impact and vibration from grabbing, charging and tipping | Details chosen for shock, not only for static load, and the inspection points that follow |
Protection levels and temperature limits belong to the proposed equipment and to the supplier's documents, item by item. A single figure quoted for "the crane" usually means the figure was not calculated for the part that fails first.
Step three: the duty class follows the cycle, not the word slag
Slag duty is usually heavy, and "heavy" is still not a class. The class of each mechanism is calculated from how often it starts, how long it runs and how much of its rated load it carries. A grab crane on a single shift and the same crane on two shifts are different machines even when the bay looks identical.
- Count lifts per hour in the busiest shift, hours per shift, and working days per year — not an average week.
- Record the usual load as a share of the rated load, not only the heaviest lift of the month.
- Say whether the cycle includes digging, dragging or charging impact, because that is a load case of its own.
- Ask for the class of the hoisting, traversing and long-travel mechanisms separately, each with the cycle it was calculated from.
Classification frameworks describe how to calculate a class; they do not hand you the class for your bay. The calculation needs your cycle, and a quotation that names a class without the cycle behind it has not answered the question.
The data to send, in the order the specification uses it
Most of this can be collected without a crane supplier on site. Send what you have and mark what you do not; an enquiry that says which values are missing is easier to answer than one that fills the gaps with assumptions.
| Value | Where it comes from | Why it changes the answer |
|---|---|---|
| Handling method | How the slag is dug, lifted, carried and tipped | Sets the attachment, and the attachment sets the load case |
| Heat source and its position | The vessel, the pit or the runner, and where it sits relative to the crane | Sets what has to be shielded and what can be left exposed |
| Dust, fume and steam | What the bay looks like at the worst moment of the cycle | Sets what the panels, brakes and bearings have to survive |
| Crane span (rail centre distance) | Tape between the rail centrelines, at several stations | The crane is built to this value, and it is not the same as column spacing |
| Column spacing | Building drawing, or tape between column centres along the runway | Sets the runway span and the number of supports |
| Rail top elevation | Survey or level to the top of each rail | The datum for hook height and for the crane's overall height |
| Clear headroom | The highest point of travel, including trusses, ducts and lights | Decides whether a taller crane fits at all |
| Hook height and lift | The highest and lowest pick, plus sling and attachment depth | Turns the building height into a usable working range |
| Process cycle | Lifts per hour, hours per shift, days per year, usual load share | Sets the duty class of each mechanism |
| Power supply and control position | The site supply, and where the operator will stand or sit | Sets the control arrangement and the cable route |
| Planned change | Any second shift, higher throughput or a new product | Changes the class you should be buying for, not just the one you need today |
What the quotation has to state for slag duty
Compare quotations line by line against this list. A quotation that covers the crane and leaves the attachment, the shielding and the wear parts to a later conversation has not priced the job.
- The attachment, its own rating, and who states the capacity of crane, attachment and load together
- Which items are shielded from heat, and how, item by item — not one statement for the whole crane
- The class of each mechanism, with the cycle it was calculated from
- The rope or chain specification, and the inspection points that follow from heat and dust
- The control arrangement, the operator's position, and what the operator can see of the grab and the pit
- Wear parts, the spare parts list, and how the grab is changed out
- The documents: drawings, maintenance manual, and the format of the inspection record
Wear parts are a running cost that the quotation can hide. Ask for the list and the change-out procedure before comparing totals.
LET'S DISCUSS YOUR JOB
Specifying a crane for slag handling?
Send the handling method, the heat source and the cycle you actually run. We can point out which values the specification depends on and which are still missing.
WhatsApp our team ↗Or email our team directly. If the form does not load, use email or WhatsApp.
COMMON QUESTIONS
Questions about slag crane selection
Slag crane vs ladle crane: what is the difference?
A ladle crane carries molten metal on a fixed process cycle: fill, carry, pour and return, with a holding arrangement that does not depend on one component and lowering control fine enough to pour. A slag crane carries what comes off that cycle: molten slag in a pot, or cooled slag dug with a grab or lifted with a magnet. The ladle crane is specified around the pour; the slag crane around the attachment and the heat at the pit or the yard. One machine cannot serve both duties without compromising the cycle it was calculated for.
Can one crane handle slag and ordinary workshop loads?
A hook crane with a dedicated sling can do both, at the cost of slinging time on every lift. A grab crane is built around the grab: its structure and duty follow the digging load, so using it for general workshop lifting means moving a heavier machine than the workshop needs. Decide which job sets the cycle before comparing arrangements.
Grab or magnet for slag?
A grab takes loose slag and debris from a pit or a heap and releases it under control. A magnet picks ferrous pieces and drops them when the supply is cut, so it depends on the material being magnetic and on the pieces being liftable as they lie. Mixed or hot material may not hold. The handling method decides, not a preference for one attachment.
Does slag handling automatically mean a higher duty class?
Not automatically, but the cycle usually does. The class of each mechanism follows from starts per hour, running time and how much of the rated load is carried. Two bays with the same crane can end up in different classes because one runs a second shift, or because one digs while the other only lifts.
What does heat damage first on a slag crane?
The items closest to the radiant face: the rope or chain, the cables and their insulation, the brake, and the panel. Shielding one item and leaving the next exposed moves the failure rather than removing it. Ask for the shielding item by item, and for the inspection points that follow from it.
Do you supply slag handling cranes?
This page is a selection guide, not a product listing. Capacity, span and lifting height are confirmed for the quoted configuration. No catalogue range is published because the machine is built to the ordered size. Send the handling method, the heat source and the cycle, and the configuration can be discussed for your project.