Equipment and rating
Match the quoted configuration to your load, application and frequency of use.
Buying guides
Get a clear starting point for comparing equipment, describing your workspace and reviewing a quotation.
DUTY CLASS
How the class is calculated, the figures to collect and where the number must come from.
Read the guide →02OVERHEAD CRANE COMPARISON
How the two arrangements differ on hook height, span, duty, runway loads and quotation scope, and what to measure first.
Read the comparison →03MONORAIL & TROLLEY HOIST
Six beam dimensions to measure, fixed hoist versus trolley selection, and the checks before adding a trolley to an existing monorail.
Read the measuring guide →04SPAN, HEIGHT & HEADROOM
Four numbers that decide whether a crane fits the bay, the six site measurements, and the figures to compare in a quotation.
Read the measuring guide →05SLAG HANDLING
Choose the attachment, then the protection, then the duty class — with the site data each step depends on and what the quotation has to state.
Read the selection steps →06BUYING ECONOMICS
The cost blocks inside an overhead crane, the buyer decisions that move them, and how to compare quotes at equal scope.
Read the cost drivers →0720-TON CLASS
The six variables that set a 20-ton quotation, how to read one line by line, and what to send for a comparable number. No prices published.
Read the cost guide →08BUYING GUIDE
Check installation, documents, inspection and delivery scope before you place the order.
Explore →09EQUIPMENT COMPARISON
Compare work coverage, installation requirements and the complete quotation scope.
Explore →10BUYING QUESTIONS
Review workspace, quotation scope and questions about the proposed model.
Explore the questions →11INSPECTION
What to check, who signs it, what the record holds and when a defect stops the crane.
Read the checklist →12RUNWAY & INSTALLATION
Survey items, joint details, acceptance values and the handover record for a crane runway.
Read the requirements →13QUESTIONS WE GET ASKED
Capacity, foundations, duty class, documents, lead time, payment, packing and spare parts, answered in one place.
Read the FAQ →PREPARE YOUR ENQUIRY
Match the quoted configuration to your load, application and frequency of use.
Review usable hook height, working coverage, overall clearances and required supporting works.
List the frame or bridge, hoist, trolley, controls, power feed and other included items.
State destination requirements early; agree drawings, instructions and any required compliance evidence.
Confirm packing, shipment scope, delivery terms and the agreed production schedule in the quotation.
Buying for a project? An overhead crane supplier states the scope, the documents and the eight values a quotation needs.