SUPPLIER
Source an Overhead Crane Built Around Your Lifting Task
We supply overhead travelling cranes, gantry cranes, jib cranes and hoists as configured equipment: a proposed arrangement, a drawing, a defined scope of supply and a quotation, with installation and commissioning responsibilities stated in writing. Tell us the lifting task and the site and the configuration follows.
The four families we supply
Every enquiry starts from the task and ends in one of these families, configured for the bay it serves.
- Portable gantry cranes: a frame over the load, moved between lifting positions, with the hoist and trolley package matched to it
- Jib cranes and wall-mounted hoists: a rotating arm over one workstation, with the foundation or wall bracket as part of the scope
- Electric hoists and manual chain blocks: the lifting package, and the beam, trolley or monorail it runs on
- Overhead travelling cranes: travel across a bay on runway beams, where the building is part of the project
Where supply starts and ends
The equipment is built for the order, so the supply is a defined scope, not a catalogue item. Each line below is either included, priced separately, or written down as an exclusion.
| Step | What you receive | What we need from you |
|---|---|---|
| Proposal | The arrangement proposed for your task, with the reasons it fits the bay and the cycle | The load, the lifting positions, the workspace and the destination country |
| Drawing | The general-arrangement or approval drawing for the unit proposed | Confirmation of the bay section, headroom and the datum the heights are measured from |
| Scope and quotation | The scope of supply with inclusions and exclusions, and a number attached to that scope | The eight values below, so the number describes your task and not a generic machine |
| Packing and freight | The packing arrangement and the shipping terms agreed for your destination | The delivery point, any transport limit on route, and who unloads at site |
| Installation and commissioning | The responsibilities for erection, power connection, commissioning and handover stated in writing | Who owns the foundations, runway and building steelwork, and who may sign acceptance at your site |
| Documents | Operating instructions and the test and inspection records agreed for your order, in the agreed language | Which documents your site, insurer or authority requires, and the language they must be in |
What leaves with an order
- The general-arrangement drawing of the unit proposed
- The scope of supply: crane or frame, hoist, trolley, controls, and the items left out
- The operating and maintenance documents issued with the equipment, and their language
- The packing arrangement, and the shipping terms agreed for your destination
- Who designs the foundation, runway or bracket, and who commissions the equipment on site
Which of these are included, in what language, and on what shipping terms, is stated in the quotation for your order. The site publishes no delivery date before the configuration is fixed.
The eight values a quotation needs
Send these and quotations become comparable line by line. Send only a capacity and every number back describes a different machine.
- Span or working radius from your site, not from a catalogue
- Hook height with the datum, highest and lowest pick, attachment depth included
- Rated load plus the heaviest single lift with spreader, magnet or grab
- Duty: lifts per hour, hours per day, days per week, full-load share
- Control: pendant, radio or cabin, and how precisely loads are positioned
- Environment: indoor or outdoor, heat, dust, moisture, corrosive atmosphere
- Scope split: runway, installation, commissioning, documents — who does what
- Destination, delivery term, and any transport or site-access limit
A quotation built on these eight answers can be compared line by line. A quotation built on capacity alone cannot.
Who sets the lead time and the acceptance
Neither is published on this site, and neither is standard across orders. Both are fixed for your order, in writing, before it is placed.
- The delivery date is stated in the quotation, after the configuration is fixed — never before, and never as a website figure
- Acceptance criteria are agreed with the quotation: what is measured, who signs, and what happens if a value is outside the drawing
- Local registration, permits and periodic inspection at your site follow your authority, not the supplier
- Installation and commissioning responsibilities, and who signs handover, are named lines in the quotation
Send the eight values on the enquiry form and the answer is a configured supply with a number attached, not a catalogue item.
LET'S DISCUSS YOUR JOB
Buying a crane for your project?
Send the load, the workspace and the destination. We will propose the arrangement and state what is included and what is not.
WhatsApp our team ↗Or email our team directly. If the form does not load, use email or WhatsApp.
COMMON QUESTIONS
Questions about overhead crane supplier
Are you a crane supplier or a trading company?
We engineer, quote and supply configured lifting equipment against your task: the arrangement, the drawing, the scope and the documents. Each unit is built for the order, and the quotation states what is included and what is excluded.
Do you supply single units or only whole projects?
Both. Each unit is quoted on its own configuration, whether it is one hoist for a workstation or several cranes for a bay. The eight values above are what turn either case into a comparable number.
What does the supply include?
The arrangement, the drawing, the defined scope, the packing and freight terms, and the documents agreed for your order. Installation, commissioning, foundations and runway works are stated as included or excluded lines, never left implied.
Who installs and commissions?
The quotation says so line by line. Foundations, runway beams, columns, power supply and local approvals stay with your side unless the quotation states otherwise, and the handover is signed by the named party.
What do you need to quote?
The eight values on this page: span or radius, hook height with datum, rated load with attachment, duty cycle, control method, environment, scope split and destination with delivery term. Anything missing becomes a question, not an assumption.
How is the delivery time set?
In the quotation, after the configuration is fixed. No date is published on the site, because the date depends on the scope being quoted. Acceptance follows the criteria agreed with the quotation and the requirements of your local authority.
