QUESTIONS WE GET ASKED

Crane buying questions, answered

Short, factual answers to the questions that come up before an order. Where an answer depends on your site, it says which drawing, standard or document settles it.

These answers come from questions buyers have actually sent us about workshop cranes, hoists, runways and steel-plant handling. They are written to help you decide what to ask for, not to replace the drawings and documents for your own project.

Choosing the equipment and the working envelope

Start with the load, the space it has to travel through and the structure that will carry it. These are the answers that decide the arrangement before any model is named.

What information do I need to get a quotation?

The load, the working span or reach and the lift height are enough to start. Add what is being lifted, how often, indoor or outdoor conditions, the power supply and the destination country, and the reply becomes a machine discussion rather than an approximation. Site drawings and the available headroom help too.

Send an enquiry · What a quotation should state

How do I choose the capacity and the span?

Capacity comes from the heaviest load including the attachment, not from a nominal figure. Span is measured between the actual runway rails, so it should come from the bay drawing or a site measurement rather than from the building drawing. Send both and the values that can be built are confirmed in the proposal.

Single-girder overhead crane · How to measure span and hook height

How close to the end of the bay can the hook travel?

On a single-girder crane the hook approach is set by the hoist envelope under the girder and by the end carriage, so it differs with the hoist arrangement. State the approach you need at each end and it is confirmed against the proposed hoist rather than assumed from a standard figure.

Single-girder overhead crane · Hook approach, span and hook height

What span should I expect from a single-girder crane?

A single-girder crane is normally the economical answer over the spans most workshop bays use. As the span grows, the girder depth needed for stiffness reduces that advantage, and a double-girder arrangement gives a better result in the same building. Where the crossover falls depends on your span, duty and headroom, so it is settled in the proposal.

Single girder vs double girder crane · Runway installation requirements

When is a double-girder crane the better choice?

Double girder is the arrangement to discuss when headroom is tight, the lift height is large, the span is long or the duty is heavy, because it also gives a platform for the trolley and the panel. Whether it fits an existing building is a runway and column question, not only a crane question: send the bay drawing with column spacing, rail level and clear height.

Single girder vs double girder crane · Runway installation requirements

Fixed hoist or hoist with trolley — how do I choose?

A fixed hoist lifts at one position and is the simpler answer for a workstation or a machine. Add a trolley when the load also has to travel along a beam, a monorail or a jib arm. State whether the load moves horizontally, and the beam section if it does.

Monorail hoist: fitting an I-beam trolley · European wire-rope hoist

What determines the lift height of a wire-rope hoist?

The hook travel you need, plus the rope the drum has to carry. Drum capacity, reeving and the available headroom are agreed together, because a long lift in a low building usually changes the arrangement rather than only the rope length.

European wire-rope hoist · CD wire-rope hoist

What if there is no power supply at the lifting point?

An occasional lift does not always justify a power feed at the lifting position. Where the lift is light enough to be done by hand, a hand-operated chain block hung from a beam, a trolley or a gantry frame is the option to discuss, and the fixing point and the available headroom belong in the same conversation as the load.

Hand-operated chain block

Reach or lift height — which matters more for a jib crane?

Reach. A jib covers a radius around its column, so the working envelope is set by the arm length. Choose the coverage you need first and the capacity second; the other order usually produces an oversized crane.

Pillar jib crane

Floor, structure and installation

A crane is only as good as what holds it up. These are the items that have to be settled on site, and the ones most often missing from an enquiry.

What foundation does a pillar jib crane need?

The base transmits the overturning moment of the load plus the crane self-weight into the floor, so the foundation is sized from the reach and the capacity rather than picked from a table. Send the reach, the lift height and the floor situation; the foundation loading then becomes part of the supply information.

Pillar jib crane

What has to be checked before ordering a wall-mounted jib?

The wall, column or concrete that carries the bracket, because it takes the full overturning moment of the load. Its type, section or strength has to be established before the bracket design can be confirmed. This is the item most often missing from a wall jib enquiry.

Wall-mounted jib hoist

Why is a wall-jib reach usually shorter than a pillar-jib reach?

The bracket and tie rod have to transfer the load moment into the supporting structure, and that moment grows quickly with reach. A shorter arm keeps the bracket loads and the structure requirements within practical limits.

Wall-mounted jib hoist · Pillar jib crane

Do I need a concrete foundation for the gantry rail?

The rail has to transfer the wheel loads into the ground, so either an existing track with sufficient bearing capacity or a new foundation is needed. Send the wheel loads and the condition of the ground or existing track, and the foundation becomes part of the quotation rather than a site surprise.

Portable gantry crane · Runway installation requirements

How is an outdoor gantry crane rated for wind?

The crane is designed to an agreed in-service and out-of-service wind condition for your site, and the anchoring or rail clamp arrangement follows from it. Wind exposure is a design input, so state the location and whether the crane stays outside permanently.

Trackless gantry crane

Can the gantry crane be lengthened or moved later?

Span is built into the structure, so it is not a field adjustment: agree it correctly at the start. Moving a frame to another yard is possible when the rail gauge and the new floor or foundation are checked against the same wheel loads.

Adjustable portable gantry crane

Which beam section does a hoist with trolley need?

The trolley has to match the beam profile and the flange the wheels run on, so send the beam section or the monorail drawing. The beam also has to carry the wheel loads, which is checked together with the trolley selection.

European wire-rope hoist

Can a trolley hoist be added to an existing monorail?

Usually yes. Send the monorail section, the available height and the lift height you need, and the trolley type and travel arrangement that fit the existing beam are confirmed with the quotation.

Monorail hoist: fitting an I-beam trolley · CD wire-rope hoist

Duty class, safety and hot-metal work

Two cranes of the same capacity are not the same machine. Usage profile and environment are what separate them.

How is the duty class decided?

The class combines the load spectrum with the class of utilisation: how often, how long and how fully loaded the crane works. It is derived from your cycle profile and then confirmed against the standard that applies at your site (FEM 1.001, ISO 4301 or the local equivalent). A catalogue value is not a substitute for that calculation.

Crane quotation checklist

What is the difference between M4, M5 and M7 in the specifications?

They are duty classifications, not quality grades. A higher class means the crane is rated for more cycles, a heavier load spectrum, or both, and the motor, brake, gearbox and structure are selected accordingly. Specifying a light class for continuous production is one of the most common specification errors.

Crane quotation checklist

What makes a molten-metal handling crane different?

The consequence of a dropped load is severe, so molten-metal handling is treated as a separate safety case. Standards such as FEM 1.001 place additional requirements on hoisting brakes and redundancy, and heat, dust and fume exposure decide the shielding, cable insulation class, enclosure rating, lubrication and maintenance interval. The rule that applies at your site is confirmed before design freeze, not inferred from a catalogue class.

Steel plant lifting

What do you need to know before designing a ladle crane?

The laden weight of the ladle including skull and attachment, the span, the lift height and the pouring speed range the process needs. Add the ambient temperature at the bridge and the applicable molten-metal standard for your site, and the safety architecture can be settled.

Steel plant lifting · Steel service centre lifting

Quotation, documents and lead time

What should be in writing before an order, and what the paperwork has to cover on arrival.

Are the parameters on a product page final?

No. Some pages state the range a standard series or a manufacturer catalogue covers, some list only the configurations quoted so far, and the rest publish no figures and say that capacity, span or lifting height is confirmed for the quoted configuration. None of them is a commitment for your unit: final design and component selection are confirmed with the order, against your runway, duty profile and site conditions. Where a value is marked as requiring confirmation, treat it as an item to settle before design freeze.

Crane quotation checklist

Which documents come with the shipment?

Typically the declaration of conformity, the load test report, electrical schematics, the erection manual, the spare parts list and the maintenance schedule, in English by default. Any additional inspection or third-party documentation your site requires has to be agreed in the order, not after shipment.

Inspection checklist

What lead time should I plan for?

Lead time depends on the configuration, the component selection and the production schedule at the time of order, so it is stated in the quotation against a defined starting point, normally order confirmation and deposit. Ask for the delivery date and its starting point together, and clarify how transit and customs are treated.

Crane quotation checklist

Do you provide installation and operator training abroad?

For export projects the erection drawings and documentation are supplied, and remote video guidance or on-site supervision plus operator and maintenance training can be arranged. Which of these applies is confirmed with the order, because it depends on the destination and the site arrangements.

Runway installation requirements · Inspection checklist

Payment, packing and shipping

Commercial terms are project-specific on this site. What can be stated is where each term is written down and what to ask for.

What payment terms do you offer?

Payment terms are set in the quotation and repeated on the proforma invoice; they depend on the order value, the destination and whether it is a repeat order. There is no single published term, so ask for the terms that apply to your project before comparing offers on price alone.

Send an enquiry

How is the crane packed and shipped?

The crane is shipped in sections sized for the transport route, with the wire rope, electrical parts and loose items packed separately and itemised. Packing, port of loading, Incoterms, freight and insurance are agreed per order and stated in the offer; ask for the packing list and the shipping configuration you need.

Crane quotation checklist

Warranty and spare parts

What to get in writing before the order, and what to keep on the shelf afterwards.

What warranty comes with the crane?

The warranty period and what it covers are stated in the quotation and the contract for each project, and they depend on the equipment and the site conditions. Ask for the warranty terms in writing before the order, together with the maintenance schedule the warranty assumes.

Inspection checklist

How do I get spare parts after delivery?

Ask for the spare parts list with the shipment and agree the items to hold on site: wire rope, brake linings, limit switches, contactors and the wearing parts identified in the maintenance schedule. Parts are supplied against the crane serial number and the component list on the drawing.

Inspection checklist

LET'S DISCUSS YOUR JOB

Still have a question?

Send the one that matters for your project. A short description of the load and the workspace is enough to start.

WhatsApp our team ↗

Or email our team directly. If the form does not load, use email or WhatsApp.

Send your enquiry directly to our team. Our form service processes your message and we use your details to respond to this enquiry. If the security check does not appear after a few seconds, use the email or WhatsApp links below — your answers are copied into the message. Privacy & enquiries.

Security check not loading, or prefer a direct message? Send the same details by email or WhatsApp — your answers are copied into the message.

These links open your email app or WhatsApp. Review the message and send it there.

Keep reading