CD-type electric wire-rope hoist — White-background main view
White-background main view

HOISTS / ELECTRIC WIRE ROPE

CD-type electric wire-rope hoist

Explore CD-type trolley-mounted electric wire-rope hoists, motor, gearbox and hook reference views. Discuss the lifting job and beam interface.

Confirm the exact model, rated load, lift, operating conditions and scope of supply in the quotation.

YOUR APPLICATION

Match the equipment to your job

Discuss a CD-type electric wire-rope hoist for vertical lifting with a compatible support and trolley arrangement.

Details that shape your configuration

Lifting task

Describe the item, load, lifting height and frequency of use.

Supporting beam

Send beam details, trolley travel requirements and available space.

Power and speed

State voltage, frequency, phase and lifting speed preference if known.

Unknown details can be discussed. Ratings, dimensions and included equipment are confirmed for the exact configuration quoted.

What the beam and the duty decide

A wire-rope hoist is one half of an interface. The rope, the hook-block travel and the trolley have to agree with the beam and the working cycle, and those are the details that decide whether the unit fits.

CAPACITY

What the CD wire-rope hoist series covers

Capacity is from our standard series; the lifting-height range comes from the manufacturer's series catalogue and model-level values are confirmed with the order.

ModelsRated capacitySpan or reachLifting heightDuty class
CD1/MD1 series0.5–10 t6–30 mM4

A quoted unit takes one value from each range; the combination, together with the hoist, controls and documents, is confirmed on the drawing and in the quotation. Sizes outside these ranges are built to order and quoted individually.

Product & component illustrations

AI-edited product images in brand colors. Components may show different configurations. Visible ratings belong only to the pictured example. Workshop scenes are illustrations, not factory, customer or load-test evidence.

Describe your lifting task

Share the load, lifting height, support details, frequency of use, environment and delivery destination. Confirm dimensions, rated configuration, lifting medium, controls or hand operation, inspection requirements and operating instructions for the exact model.

Paint colors and mechanism views are visual references. Material grade, duty, brake arrangement and operating limits require model-specific documentation.

Fitting a trolley hoist to a monorail beam →

Before you enquire

Rated load, span, lifting height and the scope of supply are agreed for the configuration quoted; the enquiry is where those values are set for your site.

Can I replace an existing hoist using photos alone?

Photos help start the conversation. A replacement also needs the existing nameplate, mounting dimensions, power supply and application details checked for compatibility.

How do I specify the lifting task?

Describe the item, the load, the lifting height and how frequently it will be used. Rated load, lift and speed are confirmed for the quoted model.

How does the hoist connect to my beam or trolley?

Send the beam details, the trolley travel you need and the available space. The mounting arrangement and clearances are reviewed for the proposed hoist.

What should I send with my enquiry?

The load, lifting height, frequency of use, supporting beam details, voltage, frequency and phase, and the delivery country.

Compare another arrangement

LET'S DISCUSS YOUR JOB

Discuss this hoist

Share the load, lifting height, supporting structure, working environment and delivery destination.

WhatsApp our team ↗

Or email our team directly. If the form does not load, use email or WhatsApp.

Send your enquiry directly to our team. Our form service processes your message and we use your details to respond to this enquiry. If the security check does not appear after a few seconds, use the email or WhatsApp links below — your answers are copied into the message. Privacy & enquiries.

Security check not loading, or prefer a direct message? Send the same details by email or WhatsApp — your answers are copied into the message.

These links open your email app or WhatsApp. Review the message and send it there.