Supporting structure
Share photos and available structural drawings of the proposed mounting location.

JIB BRACKETS / WALL MOUNTED
Explore wall-mounted swivel brackets with compact electric wire-rope hoists, tie-rod and diagonal-brace configurations, mounting details and component views.
Confirm the rated configuration, reach, lifting height, power supply, controls and mounting design in the quotation.
YOUR APPLICATION
Discuss a compact lifting position where a wall or column mounting arrangement may suit the task.
Share photos and available structural drawings of the proposed mounting location.
Mark pickup and set-down points, required reach and nearby obstacles.
Describe the load, hook height, power supply and control preference.
Unknown details can be discussed. Ratings, dimensions and included equipment are confirmed for the exact configuration quoted.
CAPACITY
Series data comes from the manufacturer's series catalogue; model-level values for your capacity are confirmed with the order.
| Models | Rated capacity | Span or reach | Lifting height | Duty class |
|---|---|---|---|---|
| BX series | 0.25–1 t | reach 4–5 m | up to 10 m | A3 |
A quoted unit takes one value from each range; the combination, together with the hoist, controls and documents, is confirmed on the drawing and in the quotation. Sizes outside these ranges are built to order and quoted individually.
AI-edited illustrations based on supplied photos. Workshop backgrounds are illustrative, not evidence of our factory or customer installations. Tie-rod and diagonal-brace examples differ. Component and control views do not establish a standard supply package.
Share the load, lifting path, required reach and height, available power, wall or structural support details and delivery destination. Ask for the bracket and hoist specification, dimensional drawing, anchorage design and installation instructions.
Wall capacity, anchorage, rotation clearance, controls and indoor or outdoor suitability need confirmation for the exact installation. Pictures do not establish load capacity or structural approval.
Compare a floor-mounted pillar jib →Rated load, span, lifting height and the scope of supply are agreed for the configuration quoted; the enquiry is where those values are set for your site.
No. The supporting structure, connection and anchors need review for the exact equipment and loads. A bracket image is not approval of a mounting location.
Mark the pickup and set-down points, the required reach and nearby obstacles, then state the item and approximate weight. Rated configuration, reach and lifting height are confirmed for the quoted equipment.
Share photos and any available structural drawings of the proposed mounting location, plus the hoist arrangement you need. The anchorage design, rotation clearance and control package are confirmed in the quotation.
The load, lifting path, required reach and height, available power, wall or structural support details and the delivery country.
LET'S DISCUSS YOUR JOB
Share the load, lifting positions, available wall space and installation location. We will clarify the proposed bracket, hoist and mounting arrangement.
WhatsApp our team ↗Or email our team directly. If the form does not load, use email or WhatsApp.