Working area
Mark the lifting positions, required working radius and obstacles around the column.

JIB CRANES / FLOOR MOUNTED
Explore floor-mounted pillar jib crane configurations with electric hoists and rotation-drive examples. Discuss your working radius, lifting height and installation requirements.
Rated load, working radius, lifting height, rotation range, controls and installation are confirmed for the quoted configuration.
YOUR APPLICATION
Discuss a fixed lifting station for handling between pickup and set-down points around a column.
Mark the lifting positions, required working radius and obstacles around the column.
Share floor or foundation information and the proposed column position.
Describe required hook height, power, frequency of use and desired rotation and controls.
Unknown details can be discussed. Ratings, dimensions and included equipment are confirmed for the exact configuration quoted.
CAPACITY
Values are from our standard series.
| Models | Rated capacity | Span or reach | Lifting height | Duty class |
|---|---|---|---|---|
| JP-1, JP-2, JP-3, JP-5 | 1, 2, 3, 5 t | working radius 3–6 m | 4–5 m | M4 |
A quoted unit takes one value from each range; the combination, together with the hoist, controls and documents, is confirmed on the drawing and in the quotation. Sizes outside these ranges are built to order and quoted individually.
AI-edited product illustrations based on supplied photos. Production backgrounds are illustrative, not evidence of our factory or customer installations. These images show different hoist and mounting arrangements.
Share the load, pickup and set-down points, available headroom, power supply, floor or foundation information and delivery destination. Confirm the dimensional drawing, foundation design, anchor arrangement, rotation drive, hoist, trolley and control package before ordering.
Remote control, outdoor suitability and rotation limits require confirmation for the exact model. These illustrations do not establish structural approval or foundation adequacy.
Rated load, span, lifting height and the scope of supply are agreed for the configuration quoted; the enquiry is where those values are set for your site.
That requires review of the exact crane and site. Ask for the installation drawing, foundation and anchor requirements, and confirmation by the responsible engineer before installation.
Describe the item and approximate weight, mark the pickup and set-down points around the column, and state the working radius and hook height you need. Rated load, radius and rotation range are confirmed for the quoted configuration.
Describe the column position, obstacles, rotation range you need and the available headroom. The foundation design, anchor arrangement, rotation drive and control package are confirmed in the quotation.
The load, pickup and set-down points, available headroom, power supply, floor or foundation information and the delivery country.
LET'S DISCUSS YOUR JOB
Share your load, pickup positions, working area and installation location. We will review the proposed crane and hoist arrangement.
WhatsApp our team ↗Or email our team directly. If the form does not load, use email or WhatsApp.