Building layout
Share runway span and length, building clearances and available structural drawings.

OVERHEAD CRANES / SINGLE GIRDER
Explore single-girder bridge crane arrangements, low-headroom wire-rope hoists, workshop installations and end-carriage assembly views. Discuss the crane span and your building interface.
Confirm the exact model, rated load, lift, operating conditions and scope of supply in the quotation.
YOUR APPLICATION
Discuss overhead handling across a working bay using a single-girder bridge and hoist arrangement.
Share runway span and length, building clearances and available structural drawings.
Describe the load, hook height, lifting positions and frequency of use.
Clarify runway, rails, power feed, controls, installation, commissioning and delivery responsibilities.
Unknown details can be discussed. Ratings, dimensions and included equipment are confirmed for the exact configuration quoted.
CAPACITY
Values are from our standard series.
| Models | Rated capacity | Span or reach | Lifting height | Duty class |
|---|---|---|---|---|
| OS-1, OS-2, OS-3, OS-5, OS-10 | 1, 2, 3, 5, 10 t | 10.5–16.5 m | 9 m | M4–M5 |
A quoted unit takes one value from each range; the combination, together with the hoist, controls and documents, is confirmed on the drawing and in the quotation. Sizes outside these ranges are built to order and quoted individually.
AI-edited product images in brand colors. Components may show different configurations. Visible ratings belong only to the pictured example. Workshop scenes are illustrations, not factory, customer or load-test evidence.
Share the load, crane span, runway length, lifting height, available headroom, building drawings, power supply, working environment and delivery destination. Confirm runway and building loads, dimensional drawings, hoist and trolley configuration, controls, duty classification and installation scope for the quoted crane.
Paint colors and mechanism views are visual references. Material grade, duty, brake arrangement and operating limits require model-specific documentation.
Compare single-girder and double-girder arrangements → · Check span, hook approach and hook height →Rated load, span, lifting height and the scope of supply are agreed for the configuration quoted; the enquiry is where those values are set for your site.
No. Each visible marking belongs to the example pictured. The gallery shows different configurations; your crane rating and dimensions must be confirmed against the proposed design.
Share the runway span and length, the building clearances and any available structural drawings, then mark the lifting positions and the hook height you need. Rating and dimensions are confirmed against the proposed design.
The crane is discussed against your bay layout, clearances and lifting positions. Runway, rails, power feed, installation and commissioning responsibilities are clarified in the project scope.
Clarify the runway, rails, power feed, controls, installation, commissioning and delivery responsibilities in the quotation. The scope is project-specific.
LET'S DISCUSS YOUR JOB
Share the required load, crane span, lifting height, runway arrangement, available headroom and delivery destination.
WhatsApp our team ↗Or email our team directly. If the form does not load, use email or WhatsApp.