Load and usage
Share the load, lifting height, frequency of operation and working environment.

ELECTRIC HOISTS / WIRE ROPE
Explore compact trolley-mounted wire-rope hoists, wheel and drive arrangements, installed examples and hook details. Discuss the lifting job and proposed crane interface.
Rated load, lift, speed, duty, controls and supporting beam interface are confirmed for the quoted configuration.
YOUR APPLICATION
Discuss an electric wire-rope hoist and trolley package for your proposed supporting beam or crane.
Share the load, lifting height, frequency of operation and working environment.
Provide beam dimensions or crane drawings, required travel and available headroom.
State voltage, frequency, phase, preferred speed and control arrangement if known.
Unknown details can be discussed. Ratings, dimensions and included equipment are confirmed for the exact configuration quoted.
CAPACITY
Capacity is from our standard series; the lifting-height range comes from the manufacturer's series catalogue and model-level values are confirmed with the order.
| Models | Rated capacity | Span or reach | Lifting height | Duty class |
|---|---|---|---|---|
| HF/HT series | 0.5–10 t | 6–30 m | M4 |
A quoted unit takes one value from each range; the combination, together with the hoist, controls and documents, is confirmed on the drawing and in the quotation. Sizes outside these ranges are built to order and quoted individually.
AI-edited product illustrations with brand paint colors. Workshop and installation backgrounds are illustrative, not factory ownership, customer references or load-test evidence. Views may show different configurations; supporting tables and crane structures are not a standard supply package.
Share the load, lifting height, required travel, beam dimensions, available headroom, power supply, environment and delivery destination. Confirm the dimensional drawing, wheel and trolley arrangement, reeving, controls, operating limits and documentation.
Paint colors are a brand visualization. Capacity, duty classification, variable-speed options and exact scope require model-specific confirmation.
Measuring an existing beam for a trolley hoist →Rated load, span, lifting height and the scope of supply are agreed for the configuration quoted; the enquiry is where those values are set for your site.
Share the beam drawing and dimensions so the trolley interface and clearances can be reviewed. Similar-looking hoists may have different mounting arrangements.
State the load, the lifting height, how often the hoist will be used and the working environment. Rated load, lift, speed and duty are confirmed for the quoted configuration.
State voltage, frequency and phase, and your preferred speed and control arrangement if you know them. The electrical package is confirmed with the quotation.
The scope of supply is confirmed in the quotation. Supporting tables and crane structures shown in the illustrations are not a standard supply package.

Discuss a CD-type electric wire-rope hoist for vertical lifting with a compatible support and trolley arrangement.
View equipment →
Discuss overhead handling across a working bay using a single-girder bridge and hoist arrangement.
View equipment →LET'S DISCUSS YOUR JOB
Share your load, lifting height, supporting beam details, power supply and working environment.
WhatsApp our team ↗Or email our team directly. If the form does not load, use email or WhatsApp.