Overhead Crane
Overhead cranes travel on runway beams fixed to the building structure, so the load path goes into the columns rather than the floor. Single girder cranes suit spans up to roughly 20 m and light to medium duty; double girder cranes give a higher hook approach, longer spans, heavier duty classes and a platform for the trolley and panel. Choose on span, lift height, duty class and available headroom — not on capacity alone.
Single Girder Overhead Crane
Category page
AI-rendered illustration
10t Single Girder Overhead Crane
- Capacity
- 10 t
- Span
- 16.5 m
- Lift Height
- 9 m

AI-rendered illustration
3t Single Girder Overhead Crane
- Capacity
- 3 t
- Span
- 13.5 m
- Lift Height
- 9 m

AI-rendered illustration
5t Single Girder Overhead Crane
- Capacity
- 5 t
- Span
- 16.5 m
- Lift Height
- 9 m
Double Girder Overhead Crane
Category page
AI-rendered illustration
15t Underslung Overhead Crane
- Capacity
- 15 t
- Span
- 20 m
- Lift Height
- 8 m

AI-rendered illustration
20t Double Girder Overhead Crane
- Capacity
- 20 t
- Span
- 30 m
- Lift Height
- 10 m

AI-rendered illustration
30t Double Girder Overhead Crane
- Capacity
- 30 t
- Span
- 28 m
- Lift Height
- 12 m

AI-rendered illustration
5t European Overhead Crane
- Capacity
- 5 t
- Span
- 18 m
- Lift Height
- 8 m
