Krandura

Double Girder Overhead Crane

20t Double Girder Overhead Crane

A 20 t double girder overhead crane with a 30 m span and 10 m lift height, for heavy fabrication bays and steel plant service. The trolley runs between two main girders, which gives a higher hook approach than a single girder machine and carries the load into a stiffer structure at this span.

It suits bays where the crane lifts heavy weldments, machine parts or steel product over a long travel, and where the building height does not allow a deeper crane envelope. The catalogue span and lift height are a reference configuration; the runway drawing decides the values that can actually be built.

  • Confirm at order: span and rail level, lift height measured to the hook, duty class from the cycle profile, and control position (pendant, radio or cabin).
  • Also agree: power supply voltage and frequency, festoon or conductor bar, and whether a walkway or maintenance platform is required.

The figures below are a catalogue baseline. Final design and component selection are confirmed before ordering.

Capacity
20 t
Span
30 m
Lift Height
10 m
Work Class
M5 (catalog baseline; duty assessment required)
Power
38.5 kW (total)
Power Supply
380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order
AI illustration of 20t Double Girder Overhead Crane: main
mainAI-rendered illustration. Final equipment configuration confirmed with your order.

Specifications

Capacity20 t
Span30 m
Lift Height10 m
Work ClassM5 (catalog baseline; duty assessment required)
Speedshoist 8 m/min, cross 20 m/min, long 30 m/min
Power38.5 kW (total)
ControlPendant + Radio
StandardsFEM 1.001 / ISO 4301
Hoist Speed8 m/min
Power Supply380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order
Lifting AttachmentSingle hook reference configuration
Configuration StatusCatalog baseline; final design and component selection confirmed before ordering

Standard configuration — final spec confirmed with your order.

Applications

All applications

Key Components

Double Girder Frame

Box-type welded girder, shot-blasted and painted.

European Wire Rope Hoist

Low headroom hoist, FEM duty class.

Documents

  • Overhead Crane Catalog 2026 (20t section)

    catalog · overhead-crane-catalog-2027.pdf · 0.0 MB

    Download
›How do I choose the span for a 20 ton overhead crane?

Span is determined by the building column spacing. Measure bay width clear of columns and add rail width; standard spans run 10.5–31.5 m. Tell us your bay drawing and we confirm.

Related Products

This Product in Action

All projects

Technical Reading

All articles

Manufacturer

Henan Heavy Lifting Equipment Co., Ltd.

Zhengzhou, Henan

ISO 9001 · CE · FEM compliance

Request a Quote

Tell us your requirements — capacity, span and lift height are the three numbers we need first. Inquiring about: 20t Double Girder Overhead Crane

Not sure which configuration fits your plant?

Request a Quote