Krandura

Single Girder Overhead Crane

5t Single Girder Overhead Crane

A 5 t single girder overhead crane for general workshop lifting, maintenance bays and light fabrication. A single main girder with an underslung hoist gives a light crane and an economical runway, which is normally the best answer at this capacity.

The standard series supplies spans from 7.5 m to 22.5 m and lift heights from 6 m to 18 m. At 5 t the duty class is usually set by the number of lifts per shift rather than the load, so a process that runs continuously may need a heavier class than the weight suggests.

  • Confirm at order: span, lift height to the hook, duty class, control type and power supply.
  • Also agree: hook approach and the clear height above the rail.
Capacity
5 t
Span
16.5 m
Lift Height
9 m
Work Class
FEM 2m / M4
Power
10.8 kW
Power Supply
380V/50Hz/3ph
Supply Range
span 7.5-22.5 m; lift 6-18 m
AI illustration of 5t Single Girder Overhead Crane: main
mainAI-rendered illustration. Final equipment configuration confirmed with your order.

Specifications

Capacity5 t
Span16.5 m
Lift Height9 m
Work ClassFEM 2m / M4
Speedshoist 8/0.8 m/min; cross 20/5 m/min; long 40/10 m/min
Power10.8 kW
HookSingle hook
ModelOS-5
StandardFEM/ISO
Duty Cycle1500 h/year
Power Supply380V/50Hz/3ph
Supply Rangespan 7.5-22.5 m; lift 6-18 m

Verified datasheet — final configuration confirmed with your order.

Applications

All applications
›How close to the end of the bay can the hook travel?

On a single girder crane the hook approach is limited by the hoist envelope under the girder and by the end carriage. Tell us the approach you need at each end and we will confirm it against the hoist arrangement, rather than assuming the standard figure applies.

›What span limit should I expect for a single girder crane?

Single girder cranes are normally the economical answer up to about 20 m. Beyond that the girder depth needed for stiffness reduces the advantage, and a double girder crane usually gives a better result for the same building.

Related Products

Request a Quote

Tell us your requirements — capacity, span and lift height are the three numbers we need first. Inquiring about: 5t Single Girder Overhead Crane

Not sure which configuration fits your plant?

Request a Quote