Single Girder Overhead Crane
10t Single Girder Overhead Crane
A 10 t single girder overhead crane for higher-cycle fabrication and production work. The higher duty class than the 3 t and 5 t models means the hoist, brake and structure are selected for continuous use rather than occasional lifting.
The standard series supplies spans from 7.5 m to 22.5 m and lift heights from 6 m to 18 m. Beyond about 20 m span the girder depth needed for stiffness erodes the single girder advantage, and a double girder crane usually becomes the better answer.
- Confirm at order: span, lift height to the hook, cycles per hour (the basis of the duty class), control type and power supply.
- Also agree: hook approach, clear height above the rail, and whether a second crane or a dual hoist is planned for long loads.
- Capacity
- 10 t
- Span
- 16.5 m
- Lift Height
- 9 m
- Work Class
- FEM 3m / M5
- Power
- 17.5 kW
- Power Supply
- 380V/50Hz/3ph
- Supply Range
- span 7.5-22.5 m; lift 6-18 m
Specifications
| Capacity | 10 t |
|---|---|
| Span | 16.5 m |
| Lift Height | 9 m |
| Work Class | FEM 3m / M5 |
| Speeds | hoist 8/0.8 m/min; cross 20/5 m/min; long 40/10 m/min |
| Power | 17.5 kW |
| Hook | Single hook |
| Model | OS-10 |
| Standard | FEM/ISO |
| Duty Cycle | 2500 h/year |
| Power Supply | 380V/50Hz/3ph |
| Supply Range | span 7.5-22.5 m; lift 6-18 m |
Verified datasheet — final configuration confirmed with your order.
Applications
All applicationsFAQ
All FAQs›What lead time for a 10t single girder crane?
Standard configurations ship in 25–35 days after deposit; custom spans or European hoists add ~10 days. Sea freight transit depends on destination port.
Related Products
This Product in Action
All projectsManufacturer
Shandong Crane Machinery Co., Ltd.
Jinan, Shandong
ISO 9001 · CE
Request a Quote
Not sure which configuration fits your plant?
Request a Quote



