SELECTOR

Crane Selector: Which Arrangement Fits Your Job

Answer four questions about load, span, duty and installation, and see which crane arrangement fits, why, and what to send for a quotation.

Answer four questions

Estimates are enough. A survey fixes the values before any order.

4. Installation condition

What to send after the recommendation

Span or radius, hook height and datum, rated load with the attachment, duty cycle, control method, environment, scope split and destination. The same eight values are explained on the crane planning worksheet, with a fillable sheet and a CSV download.

COMMON QUESTIONS

Questions about the selector

Do I need exact measurements to use it?

No. Ranges and estimates are enough for a starting arrangement. The survey fixes the values before any order is placed.

Does the result replace a quotation?

No. It narrows the arrangement so the quotation can be written against the right machine. Span, hook height, duty and scope are still confirmed for the quoted configuration.

What if my case sits between two results?

The tool decides by installation first, then by capacity and duty. Borderline cases are worth comparing: open both linked pages on the same brief, or send the four values and ask which fits.

Where do the recommendations come from?

From the same arrangement logic as the buying guides: coverage area first, then load, duty and environment. Capacity alone never decides.

Related reading