Steel Mill Cranes
40t Slag Handling Crane
A 40 t slag handling crane for the dustiest and most abrasive duty in a steel plant, with a 22 m span and 13 m lift height. Slag pot transport exposes the crane to heat, heavy dust and shock loads, so availability depends on protection and on a maintenance plan that can be carried out quickly.
The attachment is specific to the slag pot and is confirmed by the manufacturer before the order. Because the environment is aggressive, the enclosure rating, the lubrication regime and the wear-part replacement interval are agreed as part of the specification rather than left to commissioning.
- Confirm at order: slag pot weight including the attachment, span, lift height, cycles per hour, and the measured conditions at the bridge.
- Also agree: duty class, dust and heat protection, attachment design confirmation, control position, and the inspection and wear-part plan.
The figures below are a catalogue baseline. Final design and component selection are confirmed before ordering.
- Capacity
- 40 t
- Span
- 22 m
- Lift Height
- 13 m
- Work Class
- M7 (catalog baseline; duty assessment required)
- Power
- Application-specific motor sizing — confirmed with quotation
- Power Supply
- 380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order
Specifications
| Capacity | 40 t |
|---|---|
| Span | 22 m |
| Lift Height | 13 m |
| Work Class | M7 (catalog baseline; duty assessment required) |
| Speeds | Variable-speed hoisting and travel; operating range confirmed with quotation |
| Power | Application-specific motor sizing — confirmed with quotation |
| Control | Pendant or radio control; selected with order |
| Power Supply | 380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order |
| Lifting Attachment | Application-specific attachment — manufacturer design confirmation required |
| Configuration Status | Catalog baseline; final design and component selection confirmed before ordering |
Standard configuration — final spec confirmed with your order.
Applications
All applicationsFAQ
All FAQs›What makes a molten metal handling crane different?
The consequence of a dropped load is severe, so molten metal handling is treated as a separate safety case. Standards such as FEM 1.001 place additional requirements on hoisting brakes and redundancy. The applicable rule for your site is confirmed before design freeze — it is not inferred from a catalogue class.
›How do you protect the crane from heat and dust?
From the measured conditions at the crane bridge, not from a general industry assumption. Temperature, dust and fume exposure decide the shielding, cable insulation class, enclosure rating, lubrication and the maintenance interval. Those values become part of the specification.
Related Products
Manufacturer
Henan Heavy Lifting Equipment Co., Ltd.
Zhengzhou, Henan
ISO 9001 · CE · FEM compliance
Request a Quote
Not sure which configuration fits your plant?
Request a Quote



