Krandura

Steel Mill Cranes

25t Billet Handling Crane

A 25 t billet handling crane for continuous product movement in a steel plant, with a 24 m span and 12 m lift height. It is a high-cycle machine: the tonnage is moderate, but the crane works continuously, so the duty class and the component selection are driven by the number of lifts rather than by the load weight.

Billet and bloom handling usually means a magnet, C-hook or lifting beam rather than a plain hook, and the attachment changes both the effective load and the reeving. Dust, scale and heat from the product set the protection and lubrication plan.

  • Confirm at order: the attachment and its weight, the heaviest single lift and the bundle dimensions, span, lift height and cycles per hour.
  • Also agree: duty class from the cycle profile, heat and dust protection, control position, and the attachment design confirmation from the manufacturer.

The figures below are a catalogue baseline. Final design and component selection are confirmed before ordering.

Capacity
25 t
Span
24 m
Lift Height
12 m
Work Class
M5 (catalog baseline; duty assessment required)
Power
Application-specific motor sizing — confirmed with quotation
Power Supply
380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order
AI illustration of 25t Billet Handling Crane: main
mainAI-rendered illustration. Final equipment configuration confirmed with your order.

Specifications

Capacity25 t
Span24 m
Lift Height12 m
Work ClassM5 (catalog baseline; duty assessment required)
SpeedsVariable-speed hoisting and travel; operating range confirmed with quotation
PowerApplication-specific motor sizing — confirmed with quotation
ControlPendant or radio control; selected with order
Power Supply380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order
Lifting AttachmentApplication-specific attachment — manufacturer design confirmation required
Configuration StatusCatalog baseline; final design and component selection confirmed before ordering

Standard configuration — final spec confirmed with your order.

Applications

All applications
›What makes a molten metal handling crane different?

The consequence of a dropped load is severe, so molten metal handling is treated as a separate safety case. Standards such as FEM 1.001 place additional requirements on hoisting brakes and redundancy. The applicable rule for your site is confirmed before design freeze — it is not inferred from a catalogue class.

›How do you protect the crane from heat and dust?

From the measured conditions at the crane bridge, not from a general industry assumption. Temperature, dust and fume exposure decide the shielding, cable insulation class, enclosure rating, lubrication and the maintenance interval. Those values become part of the specification.

Related Products

This Product in Action

All projects

Manufacturer

Henan Heavy Lifting Equipment Co., Ltd.

Zhengzhou, Henan

ISO 9001 · CE · FEM compliance

Request a Quote

Tell us your requirements — capacity, span and lift height are the three numbers we need first. Inquiring about: 25t Billet Handling Crane

Not sure which configuration fits your plant?

Request a Quote