Steel Mill Cranes
15t Mould Casting Crane
A 15 t mould casting crane for foundry moulding and pouring lines, with a 20 m span and 11 m lift height. The requirement is positioning rather than speed: mould boxes and pouring vessels have to be placed accurately, repeatedly, in a hot and dusty environment.
The crane is typically specified with controlled slow hoisting and smooth travel so the operator can stop without overshooting the mould. Dust ingress and radiant heat from freshly poured moulds are the two conditions that decide the enclosure rating, the cable insulation and the lubrication interval.
- Confirm at order: mould box or vessel weight including the attachment, span, lift height, and the slowest hoisting speed the process needs.
- Also agree: ambient temperature at the bridge, dust exposure, duty class, control position, and the attachment design confirmation from the manufacturer.
The figures below are a catalogue baseline. Final design and component selection are confirmed before ordering.
- Capacity
- 15 t
- Span
- 20 m
- Lift Height
- 11 m
- Work Class
- M4 (catalog baseline; duty assessment required)
- Power
- Application-specific motor sizing — confirmed with quotation
- Power Supply
- 380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order
Specifications
| Capacity | 15 t |
|---|---|
| Span | 20 m |
| Lift Height | 11 m |
| Work Class | M4 (catalog baseline; duty assessment required) |
| Speeds | Variable-speed hoisting and travel; operating range confirmed with quotation |
| Power | Application-specific motor sizing — confirmed with quotation |
| Control | Pendant or radio control; selected with order |
| Power Supply | 380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order |
| Lifting Attachment | Application-specific attachment — manufacturer design confirmation required |
| Configuration Status | Catalog baseline; final design and component selection confirmed before ordering |
Standard configuration — final spec confirmed with your order.
Applications
All applicationsFAQ
All FAQs›What makes a molten metal handling crane different?
The consequence of a dropped load is severe, so molten metal handling is treated as a separate safety case. Standards such as FEM 1.001 place additional requirements on hoisting brakes and redundancy. The applicable rule for your site is confirmed before design freeze — it is not inferred from a catalogue class.
›How do you protect the crane from heat and dust?
From the measured conditions at the crane bridge, not from a general industry assumption. Temperature, dust and fume exposure decide the shielding, cable insulation class, enclosure rating, lubrication and the maintenance interval. Those values become part of the specification.
Related Products
Manufacturer
Shandong Crane Machinery Co., Ltd.
Jinan, Shandong
ISO 9001 · CE
Request a Quote
Not sure which configuration fits your plant?
Request a Quote



