Box Girder Gantry Crane
10t Goliath Gantry Crane
A 10 t Goliath gantry crane with a 26 m span and 10 m lift height, travelling on rails at ground level instead of on runway beams. With an A-frame leg at each end, it needs no building structure along the travel, which is what makes it suitable for outdoor yards and storage areas.
Because the load goes into the track rather than into columns, the rail foundation and the yard bearing capacity are part of the project. At a 26 m span the crane is normally travelling heavier or longer loads than a workshop gantry, so span, wheel loads and rail gauge are agreed together.
- Confirm at order: span and rail gauge, lift height, wheel loads and the capacity of the existing track foundation, plus the storm and out-of-service wind case if the crane stays outdoors.
- Also agree: duty class, hoisting and travel speeds, control position, and the power supply arrangement along the track.
The figures below are a catalogue baseline. Final design and component selection are confirmed before ordering.
- Capacity
- 10 t
- Span
- 26 m
- Lift Height
- 10 m
- Work Class
- M5 (catalog baseline; duty assessment required)
- Power
- Application-specific motor sizing — confirmed with quotation
- Power Supply
- 380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order
Specifications
| Capacity | 10 t |
|---|---|
| Span | 26 m |
| Lift Height | 10 m |
| Work Class | M5 (catalog baseline; duty assessment required) |
| Speeds | Variable-speed hoisting and travel; speeds selected for duty and confirmed with quotation |
| Power | Application-specific motor sizing — confirmed with quotation |
| Control | Pendant or radio control; selected with order |
| Power Supply | 380V / 50Hz / 3-phase reference configuration; alternatives confirmed with order |
| Lifting Attachment | Single hook reference configuration |
| Configuration Status | Catalog baseline; final design and component selection confirmed before ordering |
Standard configuration — final spec confirmed with your order.
Applications
All applicationsFAQ
All FAQs›Do I need a concrete foundation for the gantry rail?
The rail has to transfer the wheel loads into the ground, so either an existing track with sufficient bearing capacity or a new foundation is needed. Send the wheel loads and the ground or existing track condition, and the foundation becomes part of the quotation rather than a site surprise.
›How is an outdoor gantry crane rated for wind?
The crane is designed to an agreed in-service and out-of-service wind condition for your site, and the anchoring or rail clamp arrangement follows from it. Wind exposure is a design input, so tell us the location and whether the crane stays outside permanently.
Related Products
This Product in Action
All projectsManufacturer
Shandong Crane Machinery Co., Ltd.
Jinan, Shandong
ISO 9001 · CE
Request a Quote
Not sure which configuration fits your plant?
Request a Quote