Krandura

Wire Rope Hoist

3t Electric Wire Rope Hoist

A 3 t fixed electric wire rope hoist for workstation lifting, machine tools and OEM installation. It lifts at one position on a stationary frame, or travels a short distance when mounted on a trolley.

The standard range covers lift heights from 6 m to 30 m with M4 duty. Mounting arrangement decides most of the application: a fixed frame for a single lifting point, or a trolley on a monorail or beam where the load also has to move horizontally.

  • Confirm at order: lift height, mounting arrangement (fixed frame, monorail or beam section), control voltage, and the attachment or hook type.
  • Also agree: duty class from the operating pattern and the power supply available at the mounting position.
Capacity
3 t
Span
—
Lift Height
6 m
Work Class
M4
Power
4.5 kW
Power Supply
380V/50Hz/3ph
Supply Range
lift 6-30 m
AI illustration of 3t Electric Wire Rope Hoist: main
mainAI-rendered illustration. Final equipment configuration confirmed with your order.

Specifications

Capacity3 t
Lift Height6 m
Work ClassM4
Speedshoist 8 m/min
Power4.5 kW
HookSingle hook
ModelHF-3
StandardFEM/ISO
Duty Cycle1000 h/year
Power Supply380V/50Hz/3ph
Supply Rangelift 6-30 m
Mounting ConfigurationFixed-frame reference; trolley and mounting options confirmed with order

Verified datasheet — final configuration confirmed with your order.

Applications

All applications
›Fixed hoist or hoist with trolley — how do I choose?

A fixed hoist lifts at one position and is the simpler, cheaper answer for a workstation or a machine. Add a trolley when the load also has to travel along a monorail, a jib arm or a beam. Tell us whether the load moves horizontally and the beam section if it does.

›What determines the lift height of a wire rope hoist?

The required hook travel plus the space the rope needs on the drum. Drum capacity, reeving and the available headroom are agreed together, because a long lift in a low building often changes the arrangement rather than just the rope length.

Related Products

Request a Quote

Tell us your requirements — capacity, span and lift height are the three numbers we need first. Inquiring about: 3t Electric Wire Rope Hoist

Not sure which configuration fits your plant?

Request a Quote