Wire Rope Hoist
Fixed electric wire rope hoists raise and lower on a stationary frame, so they serve one lifting position or a short trolley run. They are used at workstations, on machine tools, at loading points and as an OEM component inside other equipment. Lift height, drum capacity, mounting arrangement, control voltage and the attachment are confirmed with the order.



