Wire Rope Hoist
10t Electric Wire Rope Hoist
A 10 t fixed electric wire rope hoist for heavy workstation lifting, machine tools and OEM installation, with lift heights from 6 m to 30 m at M4 duty. At this capacity the hoist is usually one component of a larger arrangement, so the interface matters as much as the unit.
Drum capacity, reeving and the mounting frame all follow from the lift height and the attachment, and the available headroom often decides how the rope can be routed. Those three items are agreed before the hoist is selected.
- Confirm at order: lift height, mounting arrangement and beam section if trolley mounted, attachment type, control voltage and available headroom.
- Also agree: duty class from the operating pattern and the power supply at the mounting position.
- Capacity
- 10 t
- Span
- —
- Lift Height
- 6 m
- Work Class
- M4
- Power
- 13 kW
- Power Supply
- 380V/50Hz/3ph
- Supply Range
- lift 6-30 m
Specifications
| Capacity | 10 t |
|---|---|
| Lift Height | 6 m |
| Work Class | M4 |
| Speeds | hoist 8 m/min |
| Power | 13 kW |
| Hook | Single hook |
| Model | HF-10 |
| Standard | FEM/ISO |
| Duty Cycle | 1000 h/year |
| Power Supply | 380V/50Hz/3ph |
| Supply Range | lift 6-30 m |
| Mounting Configuration | Fixed-frame reference; trolley and mounting options confirmed with order |
Verified datasheet — final configuration confirmed with your order.
Applications
All applicationsFAQ
All FAQs›Fixed hoist or hoist with trolley — how do I choose?
A fixed hoist lifts at one position and is the simpler, cheaper answer for a workstation or a machine. Add a trolley when the load also has to travel along a monorail, a jib arm or a beam. Tell us whether the load moves horizontally and the beam section if it does.
›What determines the lift height of a wire rope hoist?
The required hook travel plus the space the rope needs on the drum. Drum capacity, reeving and the available headroom are agreed together, because a long lift in a low building often changes the arrangement rather than just the rope length.
Related Products
Request a Quote
Not sure which configuration fits your plant?
Request a Quote


