Wall-Mounted Jib Crane
Wall-mounted jib cranes hang from a wall or a column and keep the floor completely clear, which is what makes them useful in machine shops and confined bays. The bracket, tie rod or tie-back and the supporting structure carry the full moment of the load, so the wall or column has to be checked before the crane is ordered. Reach is usually shorter than a pillar jib.

