Krandura

Pillar Jib Crane

Pillar jib cranes stand on a foundation and swing around their own column, covering a circular area without using the building structure. They suit assembly cells, machine tending, welding bays and any workstation where parts have to be moved within a radius of a few metres. Reach, lift height, slew arrangement and the foundation loading are confirmed with the order.