Krandura

Electric Hoist with Trolley

A hoist with an electric trolley adds powered horizontal travel, so the unit can work along a monorail, a jib arm or a beam instead of lifting at a single point. It is the usual arrangement for assembly lines, warehouses and workshop bays where the load has to move along a line as well as up and down. Trolley type, beam section and travel speed are selected with the order.

No published products in this category yet.